Check whether your group qualifies for ESOS Phase 4 on 31 December 2026, complete the assessment by 5 December 2027 and keep the action plan alive for four years.

Adrien Lafond
30 min read
Illustration: an auditor in a hard hat inspects pipes with a handheld thermal camera

ESOS Phase 4 has a qualification date of 31 December 2026[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. Any UK undertaking with 250 or more employees, or with turnover above £44m and a balance sheet above £38m, assessed at group level[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓, must notify compliance by 5 December 2027, or face civil penalties of up to £50,000 plus £500 per working day[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓.

This ESOS energy audit is still only a snapshot. Since Phase 3, the scheme also looks at what you do with it over four years: action plan, progress updates. Three questions remain open: does the scheme apply to you, how do you get the assessment done in time, and how do you keep the action plan alive?

ESOS assessment: obligations, who qualifies and deadlines

A snapshot of energy use covering 95% of the total

The ESOS assessment is a dated review of an organisation's energy consumption, across all sites and all uses. Qualification and scope are assessed at group level: the UK undertaking and its corporate group comply together, whatever the number of buildings they occupy[2][2]RegulationGOV.UK, “How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4”, guidance published 30 July 2026: qualification, 95% coverage, ISO 50001 route, deadlinesSee in sources ↓.

Commissioning an ESOS energy audit is one route among others. An energy management system (EnMS) certified to the ISO 50001 standard can also be used, provided it covers total energy consumption or significant energy consumption, i.e. at least 95%[2][2]RegulationGOV.UK, “How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4”, guidance published 30 July 2026: qualification, 95% coverage, ISO 50001 route, deadlinesSee in sources ↓. Certified by an accredited body and valid on the compliance date, it replaces the audit. The regulations leave the choice. The two approaches do not commit the organisation in the same way.

The aim of the scheme: an action plan, not a report on a shelf

The scheme was never meant to fill a filing cabinet. The audit identifies energy-saving opportunities, then turns them into an action plan. Since Phase 3, that plan is submitted in MESOS and followed by progress updates signed off by a director[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. Scrutiny shifts from filing the report to the energy efficiency actually achieved.

A report on a shelf has never saved a single kilowatt-hour.

Not an EPC, not a BMS audit: what the ESOS Regulations cover

Two other confusions persist. An Energy Performance Certificate (EPC) rates a building's theoretical performance when it is sold or let, and MEES sets the minimum rating for let property: neither is an ESOS assessment. The BMS audit we carry out as BMS advisory diagnoses a control system. The ESOS assessment required by the regulations measures the consumption of a whole undertaking, even when it is called a commercial building energy audit[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓.

Size, not consumption: what has changed in ESOS, and what has not

ESOS has always depended on the size of the undertaking: 250 or more employees, or turnover above £44m and a balance sheet above £38m[3][3]RegulationGOV.UK, “Energy Savings Opportunity Scheme (ESOS)”, guidance updated 2 September 2026: qualification criteria, approved Lead Assessor registersSee in sources ↓. The ESOS Regulations of 2014 have been amended several times since, most recently by SI 2026/701, without changing these thresholds[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓.

For Phase 4, the ESOS qualification criteria still rest on size alone, not on energy consumption[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. A large company that uses little energy stays in scope. An energy-intensive SME stays out, whatever its energy bill.

Checking qualification: size on 31 December 2026, at group level

An undertaking qualifies when, on the qualification date, it has 250 or more employees, or turnover above £44m and a balance sheet above £38m[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. It then carries out an ESOS assessment every four years, covering at least 95% of its total energy consumption, unless it uses a certified ISO 50001 EnMS[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓[2][2]RegulationGOV.UK, “How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4”, guidance published 30 July 2026: qualification, 95% coverage, ISO 50001 route, deadlinesSee in sources ↓.

Qualification is assessed at group level, not site by site: the UK undertaking and its corporate group comply as one[2][2]RegulationGOV.UK, “How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4”, guidance published 30 July 2026: qualification, 95% coverage, ISO 50001 route, deadlinesSee in sources ↓. A group therefore reasons as a single participant, not company by company. The 2025 post-implementation review kept the scheme as it is, size criterion included[4][4]RegulationDepartment for Energy Security and Net Zero, “ESOS post-implementation review 2025”, recommendation “Keep”See in sources ↓. Energy consumption only comes in afterwards, to set the audit scope.

Did you know? If total energy consumption is below 40,000 kWh, no Lead Assessor is needed[2][2]RegulationGOV.UK, “How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4”, guidance published 30 July 2026: qualification, 95% coverage, ISO 50001 route, deadlinesSee in sources ↓. Very few large undertakings are in that position: for the others, a Lead Assessor on an approved register must carry out or review the assessment.

ISO 50001: never mandatory under ESOS, but a full compliance route

In the UK, no consumption level makes ISO 50001 certification mandatory, and the 2025 post-implementation review recommended keeping ESOS without major changes[4][4]RegulationDepartment for Energy Security and Net Zero, “ESOS post-implementation review 2025”, recommendation “Keep”See in sources ↓. Certification remains a voluntary route. An undertaking holding a certified ISO 50001 EnMS that covers its total or significant consumption, with a certificate valid on 5 December 2027, is compliant for Phase 4[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓.

31 December 2026 is weeks away: what should you do if Phase 4 has not started?

The Phase 4 qualification date, 31 December 2026, is weeks away, and the compliance deadline is 5 December 2027[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. Three steps follow. Check qualification at group level, because a wrong group perimeter changes everything. Appoint a Lead Assessor now, without waiting for a letter from the Environment Agency. Document every step taken towards compliance, purchase order included. There is still time to do your Phase 4 assessment properly.

Start with three years of consumption history, meter by meter, before you even choose a Lead Assessor. It sets the scope, the 12-month reference period and the quality of everything that follows.

Crossing the thresholds later: the next qualification date

An undertaking that crosses the size thresholds after 31 December 2026 is not caught by Phase 4: qualification is assessed on the qualification date of each phase[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. The gap looks comfortable. It no longer is if nobody tracks headcount and group structure: an acquisition or a new subsidiary changes the picture before anyone runs the numbers again.

An assessment every four years: is your Phase 3 assessment still valid?

The assessment is renewed every four years, phase by phase[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. Can a Phase 3 assessment, completed by 5 December 2023, be reused? We will not decide in place of the regulator. Check three points before relying on it. Does it cover 95% of your total energy consumption, the level required since Phase 3[5][5]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme (Amendment) Regulations 2023” (SI 2023/1182): Phase 3 rules, action plans, progress updates, 95% coverageSee in sources ↓? Does it rely on 12 consecutive months of data starting no earlier than 6 December 2022? Will it be signed off before 5 December 2027?

Notification in MESOS, then action plan and progress updates

First step: notify compliance to the Environment Agency by 5 December 2027, whether you used an audit or ISO 50001[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. Notification is made in MESOS, the scheme's online notification system[6][6]Bodies and institutionsGOV.UK, “Comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4”: Phase 4 dates and notification in MESOSSee in sources ↓.

Second step, separate: the ESOS action plan, due by 5 December 2028 for Phase 4, then progress updates in 2029 and 2030, all submitted in MESOS[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓[2][2]RegulationGOV.UK, “How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4”, guidance published 30 July 2026: qualification, 95% coverage, ISO 50001 route, deadlinesSee in sources ↓. One does not replace the other.

Civil penalties: up to £50,000 plus £500 per working day

Failing to comply with ESOS exposes the undertaking to civil penalties under Part 8 of the regulations[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. Failure to carry out an assessment can cost up to £50,000, plus up to £500 per working day for a maximum of 80 working days; failure to notify, £5,000 plus £500 per working day[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. The Environment Agency administers the scheme for the whole UK; each nation has its own regulator (Environment Agency, NRW, SEPA, NIEA)[7][7]Bodies and institutionsGOV.UK, ESOS Phase 4, “Appendix D: useful contacts and information”: scheme administrator and regulators by nationSee in sources ↓.

A published penalty damages a reputation long before the fine is paid.

How does the assessment work: regulations, EN 16247 method and what it misses?

ESOS Regulations 2014, Phase 4 guidance, 2023 amendment: the reference texts

It all starts with the 2012 EU Energy Efficiency Directive, whose article 8 ESOS implemented, and which the 2025 review still describes as its EU equivalent[4][4]RegulationDepartment for Energy Security and Net Zero, “ESOS post-implementation review 2025”, recommendation “Keep”See in sources ↓. The ESOS Regulations 2014 (SI 2014/1643) created the scheme in UK law[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. The Phase 4 guidance, published on 30 July 2026, sets out qualification, scope and compliance routes[2][2]RegulationGOV.UK, “How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4”, guidance published 30 July 2026: qualification, 95% coverage, ISO 50001 route, deadlinesSee in sources ↓. The 2023 amendment (SI 2023/1182) completes the picture: 95% coverage, action plans and progress updates[5][5]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme (Amendment) Regulations 2023” (SI 2023/1182): Phase 3 rules, action plans, progress updates, 95% coverageSee in sources ↓. A qualification question is therefore settled in the regulations and the guidance. A method question goes to the guidance and to the Lead Assessor.

The EN 16247 standard and its parts

The European standard EN 16247, published in the UK as BS EN 16247, describes energy audit method[9][9]Standards and protocolsBSI, “BS EN 16247”, energy audits: general requirements, buildings, processes, transport and auditor competenceSee in sources ↓. It is split into several parts: general requirements, buildings, processes, transport and auditor competence. The level of detail therefore follows the activity audited. An office headquarters falls under the buildings part, while a factory adds the processes part. A mixed site combines both. The standard is paid-for: we explain it without copying it. Which leaves the question of who is allowed to hold the pen.

Certified audit, registered Lead Assessor, certified EnMS: three distinct notions

The question comes up often: how do you get an energy audit certified? It rests on a confusion, because an audit is not certified. The assessment meets the ESOS requirements or it does not[5][5]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme (Amendment) Regulations 2023” (SI 2023/1182): Phase 3 rules, action plans, progress updates, 95% coverageSee in sources ↓. The Lead Assessor, for their part, is registered on an approved register and reviews the assessment against those requirements[5][5]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme (Amendment) Regulations 2023” (SI 2023/1182): Phase 3 rules, action plans, progress updates, 95% coverageSee in sources ↓; since 22 July 2026, they must also notify their register body of the assignment within seven days[8][8]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme (Amendment) Regulations 2026” (SI 2026/701), in force 22 July 2026: action plan review, Lead Assessor notificationSee in sources ↓. One level up, it is the EnMS that is certified, by an accredited body[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. A management system certified to ISO 50001 does exist. A certified audit does not.

Step 1: set the 95% scope and hold the kick-off meeting

First step of the ESOS assessment: choose the sites and uses that, together, reach 95% of total energy consumption, with a de minimis of 5% at most[2][2]RegulationGOV.UK, “How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4”, guidance published 30 July 2026: qualification, 95% coverage, ISO 50001 route, deadlinesSee in sources ↓. The kick-off meeting then names the internal contact, sets the site visit schedule and lists the data expected. A rushed set-up at this stage is paid for at the next one.

Step 2: collect consumption data, measurements rather than estimates

The assessor gathers invoices, meter readings and BMS trend logs over a 12-month reference period to establish the energy consumption baseline. Sorting measurements from estimates shapes everything that follows. A use reconstructed from an overall invoice remains an assumption, however well presented.

An invoice tells you how much; a reliable meter tells you where and when.

Step 3: visit the sites and analyse energy uses

The site visit reviews HVAC, lighting, server rooms and, on an industrial site, processes. An industrial energy audit also examines waste heat recovery from furnaces, compressors or chillers. An energy audit in industry has its own specific requirements. The diagram below shows how the 95% line is drawn: by group, then by site, then by use.

The 95% line is read at group level: a low-consumption site can fall outside the scope without the assessment being incomplete. The consumption figures that draw this line still have to be right.

Step 4: cost the recommendations and their payback in the ESOS report

For each recommendation, the assessor costs the investment, the expected savings and the payback period. They then rank them in the energy audit report, from a simple setting change to major works. The return on investment of each measure depends directly on the consumption figures used at step 2. A wrong baseline produces a wrong ranking.

Step 5: present the report and decide which actions to take

The closing meeting presents the audit findings to senior management. This is when you must decide which actions to take, their budget and their owner, then prepare the action plan. It is the moment when responsibilities are either fixed or diluted between building owner, operator and maintenance contractor.

Measured data: the audit relies on meters nobody has qualified

A compliant assessment documents what the ESOS rules ask of it[5][5]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme (Amendment) Regulations 2023” (SI 2023/1182): Phase 3 rules, action plans, progress updates, 95% coverageSee in sources ↓. Nothing in the process described above, however, requires the meters to be qualified before data collection. The audit therefore relies on meters nobody has qualified. The checklist below sets what the report documents against what it does not look at: tick the blind spots you have already checked across your portfolio.

Measured data · before collection
What the report documents, what it does not look at
What the report documents
  • Energy consumption by use
  • Coverage of 95% of total consumption
  • Energy-saving opportunities identified
  • Ranked recommendations with their payback period
What it does not look at
Tick what you have already checked across your portfolio.
0 / 4 blind spots checked No blind spot checked: the report will cost savings on a baseline nobody has verified.

Every box left blank is one more assumption in the report. A recommendation costed on a faulty meter stays wrong, however rigorous the calculation. Take an AHU meter disconnected for six months: ventilation is underestimated. A duplicate on heating, on the other hand, inflates its share. The energy consumption attributed to each use drifts, and the ranking of opportunities drifts with it.

Manual overrides left in place also distort the baseline, since measured consumption includes operation nobody intended. The energy audit helps identify opportunities. It does not guarantee that the starting baseline is right.

Manual overrides, setpoints and AHU schedules: what the site visit misses

A visit of a few hours captures a plant room, an electrical panel, an AHU stopped or running. It says nothing about the setpoint raised for an occupant who demands 24-25 °C and never lowered again. A visit sees equipment, not three years of control. In an ESOS energy audit, only the trend history of the building's control system fills that gap.

Five questions to ask your assessor before you sign off the report

When the audit is carried out, or at the latest at the closing meeting, ask these five questions before signing off the report:

  1. What share of the energy audit report relies on invoices rather than meters?
  2. Which meters did you check, and with what method?
  3. Which manual overrides did you find in the BMS?
  4. How did you calculate the payback periods stated?
  5. Which baseline will be used to measure the savings of each action?

TAKE ACTION

Your meters deserve checking before the assessor arrives. Our BMS advisory spots disconnections, data gaps and duplicates in the trend logs before data collection. The assessor then starts from a qualified baseline, and your costed recommendations hold up at the closing meeting.

Make your BMS data reliable

ESOS audit or ISO 50001: which route to compliance, and at what cost?

Compliance through a certified EnMS that covers the whole scope

A certified energy management system replaces the ESOS audit on one condition: it covers total energy consumption or significant consumption, i.e. at least 95%[2][2]RegulationGOV.UK, “How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4”, guidance published 30 July 2026: qualification, 95% coverage, ISO 50001 route, deadlinesSee in sources ↓. The current edition is BS EN ISO 50001:2018, with its Amendment 1 of 2024[10][10]Standards and protocolsBSI, “BS EN ISO 50001:2018+A1:2024”, energy management systems: requirements with guidance for useSee in sources ↓. The certificate must come from a UKAS-accredited body (or an EU member-state accreditor or IAF member), be issued on or after 6 December 2023 and be valid on 5 December 2027. An EnMS limited to the head office does not cover two factories left outside it: the rest needs ESOS audits. Before starting ISO 50001 certification, check that the certificate will cover every activity of the group.

Should you choose the audit or go straight to ISO 50001?

The dilemma fits in a few words: snapshot versus continual improvement. The audit freezes a state every four years. Energy management requires a recurring energy review, tracked indicators and internal audits. Our view: the standard is worth it when the organisation already has someone to keep it alive. Otherwise, the certificate becomes one more binder, renewed out of habit.

Four years between two assessments: keeping the action plan alive

Savings opportunities and payback: what the report actually quantifies

The building owner reads the report for one reason: to identify the energy-saving opportunities that deserve a budget. Each measure comes with an investment, expected energy savings and an estimated return on investment. Yet lower energy costs remain a calculated assumption as long as nothing changes in the installations. The report quantifies a potential. It does not save a single kilowatt-hour.

The action plan, progress updates and the new action plan review

The rules have shifted the burden of proof. The action plan is submitted in MESOS, then followed by progress updates signed off by a director[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. Since SI 2026/701, the next phase must also report on measures from the previous plan that were not implemented, and give the reasons[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. ESOS still does not oblige you to implement the measures, but what the undertaking chose not to do now has to be explained. The focus has moved to execution.

Why do recommendations stay in the drawer?

Because nobody owns them. The owner approves the report, the FM forwards it, the maintenance contractor waits for a purchase order and the integrator was never invited to the closing meeting. Result: recommendations never translated into the BMS, with no setpoint changed and no schedule revised. The action plan exists on paper, its implementation nowhere. In your organisation, who writes the new setpoint into the controller?

Energy drift between two assessments, year after year

Between two assessments, the building does not stand still. Energy drift sets in through small operating decisions, each defensible at the time. The timeline below follows the four-year cycle between two ESOS assessments[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓: what the rules require each year, set against the drift that builds up in the meantime.

Four-year cycle between two assessments

What the rules require each year, what the building does in the meantime

  1. Year 0 · Notification Compliance is notified in MESOS Notification by the compliance date (5 December 2027 for Phase 4). The building still matches the report's snapshot: no drift at this stage. Read ↓
  2. Year 1 · Action plan A setpoint raised for one occupant, never lowered The ESOS action plan is submitted in MESOS. In the building, a setpoint raised to settle a complaint stays in place, and nobody lowers it. Read ↓
  3. Year 2 · Progress update A fallback mode left running after a fault The fault is fixed but the fallback mode is still running. No alarm flags it and nobody is in charge of clearing it. Read ↓
  4. Year 3 · Progress update A sequence changed by a maintenance contractor An operating sequence is changed to fix a one-off problem. The change is not documented and the AHU now follows a different logic. Read ↓
  5. Year 4 · New assessment A clogged filter makes the AHU work harder The AHU compensates for the pressure drop day after day, until the filter change alert. The new assessment captures a building that uses more energy. Read ↓
The remedy · BMS advisory and IPMVP measurement Put the controls right every year, then measure every saving Make your BMS data reliable

None of these drifts shows up in a progress update built from invoices. A fallback mode left after a fault can run for months without an alarm. The new assessment then captures a building that uses more energy than the first time. Energy consumption has crept up without any decision ever intending it.

Proving savings: baseline, degree-day correction and IPMVP

Proving a saving takes three building blocks. First, a baseline: the reference consumption before the action, set on a qualified history. Next, a weather correction using heating degree days (base 15.5 °C is the usual UK reference), so that a mild winter is not mistaken for a saving. Finally, the IPMVP (International Performance Measurement and Verification Protocol) frames the calculation so that a third party can reproduce it.

At Valeo, this method measured a 28.6% reduction in HVAC consumption. Without these three building blocks, energy efficiency remains a claim; with them, the improvement in energy performance becomes verifiable.

The 10% to 20% savings promised by the market: a promise with conditions

Audit providers routinely promise substantial energy savings. We do not dispute that potential. It remains a promise with conditions: a baseline set before the works, reliable meters and actions actually applied in the controls. Optimising the energy performance of an AHU or a chilled water loop is verified at the meter. It cannot be decreed in a report.

Applying the recommendations in the BMS, then measuring them: the Foobot approach

BMS advisory: making meters reliable and translating recommendations into the controls

We do not carry out the ESOS assessment. Our BMS advisory works before and after it. Before, we make the meters reliable: disconnections, data gaps, duplicates in the trend logs. After, we translate the action plan into settings in the building: setpoints, time schedules, AHU sequences. We also remove manual overrides left in place. Implementation can then be read in the control system, not only in a tracking spreadsheet.

AI Control: adjusting HVAC every 15 minutes when the building justifies it

Some buildings need more than a corrected setpoint: high thermal inertia, variable occupancy, several water loops to balance. Our AI Control then trains in a digital twin of the building to anticipate energy demand. It then adjusts the HVAC every 15 minutes, 24/7, through the existing BMS. Elsewhere, we say it plainly: a presence detector is enough to light a corridor.

IPMVP measurement: documenting progress on the action plan

Progress updates ask what has been implemented and, since SI 2026/701, an estimate of the savings achieved in kWh. We put together the evidence behind it: a baseline per use, degree-day correction and savings that a third party can audit, action by action. The energy manager no longer reports a declared percentage. They report a measured result that an external verifier can trace. The action plan becomes a register of evidence.

Tracking consumption between two assessments with Foobot's free EMS

Between two assessments, the simplest thing is still to look at the curves. Foobot's free EMS tracks energy consumption after the actions recommended by the audit. The aim is modest and useful: see a site creeping up before the next progress update reveals it.

Filing the report is no longer enough: the evidence is built every year

An energy audit remains a snapshot. Since Phase 3, the undertaking also has to report on what it does with it over four years: action plan, progress updates, and now an explanation for every measure not implemented[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. The evidence is built in the BMS and at the meter, not in the report binder.

If you are installing or replacing a BACS in a building with heating or cooling output above 180 kW, the BACS requirements of Approved Document L follow the same logic of continuous monitoring and analysis. To track consumption after the actions recommended by the audit, Foobot's free EMS takes over between two assessments. Are your recommendations sitting idle in the BMS? Let's talk.

Let's talk

FAQ - ESOS energy audit

What does a mandatory ESOS energy audit involve?

The ESOS assessment reviews an organisation's energy consumption, covering at least 95% of its total energy consumption[2][2]RegulationGOV.UK, “How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4”, guidance published 30 July 2026: qualification, 95% coverage, ISO 50001 route, deadlinesSee in sources ↓. It identifies savings opportunities, costs the recommendations and, since Phase 3, leads to an action plan followed by progress updates.

What are the aims and benefits of an energy audit for a company?

Its aim is to rank actions by cost and payback period. The real benefit depends on execution: lower energy costs only appear if the action plan turns into setpoints that are applied, then measured.

Who can carry out an ESOS energy audit?

An ESOS Lead Assessor registered on one of the approved registers (Association of Energy Engineers, CIBSE, Elmhurst Energy Systems, Energy Institute, Energy Managers Association, ISEP, Quidos) must carry out or review it; they may be an external consultant or a member of staff[2][2]RegulationGOV.UK, “How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4”, guidance published 30 July 2026: qualification, 95% coverage, ISO 50001 route, deadlinesSee in sources ↓. Since 22 July 2026, the Lead Assessor must notify their register body of the assignment within seven days[8][8]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme (Amendment) Regulations 2026” (SI 2026/701), in force 22 July 2026: action plan review, Lead Assessor notificationSee in sources ↓.

How much does an energy audit cost?

No serious price can be given without looking at the file. The cost depends on the number of sites, the variety of uses, the level of detail required and the quality of the data. A clean history significantly reduces data collection time.

What is ESOS and who must comply?

ESOS is the energy assessment required of large undertakings: 250 or more employees, or turnover above £44m and a balance sheet above £38m, assessed at group level[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓. Qualification depends on size, not on energy consumption. The assessment is renewed every four years, phase by phase[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓.

Does ISO 50001 certification replace the ESOS energy audit?

Yes, if the certified EnMS covers total or significant energy consumption (at least 95%), with a certificate valid on the compliance date[2][2]RegulationGOV.UK, “How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4”, guidance published 30 July 2026: qualification, 95% coverage, ISO 50001 route, deadlinesSee in sources ↓. An EnMS limited to a few sites does not cover the rest, which still needs ESOS audits. ISO 50001 is never mandatory in the UK: it is a voluntary compliance route[1][1]Regulationlegislation.gov.uk, “The Energy Savings Opportunity Scheme Regulations 2014” (SI 2014/1643), as amended, including Part 8 on civil penaltiesSee in sources ↓.

What energy savings can you expect after an industrial energy audit?

No generic range holds: the potential is quantified on your actual history. An industrial energy audit identifies opportunities; only applied actions save energy. At Valeo, HVAC consumption fell by 28.6%, measured according to the IPMVP protocol.

Sources

Sources and references

10 sources.
Standards and protocols2
  1. [9]BSI, “BS EN 16247”, energy audits: general requirements, buildings, processes, transport and auditor competence↑
  2. [10]BSI, “BS EN ISO 50001:2018+A1:2024”, energy management systems: requirements with guidance for use↑
Energy newsletter

Get our articles on AI-driven HVAC control

One case study a month, on fine-grained control and its impact on building energy performance.