The monthly report lands. Added together, the readings of each electrical sub-meter do not match the main meter. Which one do you believe when recharging a tenant or reporting for ESOS?
Electrical sub-metering measures electricity consumption downstream of the main meter, by end use, by zone or by occupier. Its value lies in how well it is checked, not in the number of devices installed.
What electrical sub-metering covers in commercial buildings and what sub-meters make visible
Sub-metering: measuring by end use, by zone or by occupier
Sub-metering means measuring downstream of the main meter, by end use, by zone or by occupier. Each electrical sub-meter isolates one outgoing circuit of the electrical installation. It returns kWh measured on that single item of equipment or that single area.
This energy sub-metering remains a complementary system, never a substitute. The supplier's bill is always based on the fiscal meter, installed and operated on the supplier's behalf.
The metering strategy lists each meter, what it measures and the path its data takes. Do not confuse it with the energy data collection plan of ISO 50001 (§ 6.6): the first describes the metering hardware, the second belongs to a management system.
Sub-meter, check meter, secondary meter: what the device measures
The same device goes by three names: sub-meter, check meter or secondary meter. It belongs to the site, not to the energy supplier. This energy meter measures active energy in kWh and shows a cumulative register reading on an LCD screen.
Measurement is either direct (whole current) or via a current transformer, depending on the current rating of the circuit. Choosing the right electrical sub-meter type therefore starts from the circuit itself, as detailed further down.
Main meter and sub-meters: two roles that never replace each other
The main meter, also called the fiscal meter, is installed and operated on behalf of your electricity supplier. It is used for billing and, on half-hourly sites, for the capacity charge based on the Agreed Supply Capacity, and it can record day and night rates. It is identified by its MPAN (Meter Point Administration Number, 21 digits, shown on the bill rather than on the meter). For gas, the equivalent identifier is the MPRN.
A smart or half-hourly meter is a communicating meter, but its data comes per supply point (per MPAN), never per zone, and you obtain it through your supplier. Another reality to keep in mind: the sum of the sub-meters never exactly equals the main meter. We will see further on how to read this gap.
Apportioning and recharging consumption between occupiers
In a multi-tenant building, the apportionment key is often a convention: floor area shares, lettable area, fixed sums. Measured consumption lets you share costs on a basis nobody disputes. Measurement then helps optimise service charges line by line.
A kWh recharged to a third party, however, calls for an approved (MID) meter. We come back to this in the regulatory section.
Identifying energy-intensive end uses: HVAC, lighting, small power, hot water
Without metering by end use, an energy drift in the HVAC stays buried in the site total. The AHU that overconsumes day after day, until the filter-change alarm, shows up nowhere else.
Separating HVAC, lighting, small power and hot water lets you find savings where they actually are. Energy-intensive end uses also reveal the peaks that weigh on the Agreed Supply Capacity. Tracking the consumption of an energy-intensive item then becomes an energy efficiency lever.
Isolating a zone, a floor or equipment such as an EV charger
A let floor, a technical floor, a server room or an EV charging point: each deserves a dedicated metering point as soon as a decision concerns it alone.
Metering by zone requires a dedicated circuit in the distribution board. The choice of points to isolate therefore starts from the decision to be made, not from the wiring diagram. Precise monitoring of equipment nobody controls is useless.
Mandatory sub-metering or merely useful: what the rules say
ESOS and Display Energy Certificates: reporting that relies on meter data
ESOS (Energy Savings Opportunity Scheme) requires large undertakings to audit at least 95% of their total energy consumption every four years, on 12 months of verifiable data such as bills and meter readings. It does not require a single sub-meter as such.
Public buildings that must display a Display Energy Certificate face a stricter rule: at least 95% of consumption must be metered or estimated within allowed limits, and separable end uses can only be deducted if they are metered separately. In a multi-tenant office, a voluntary NABERS UK base building rating likewise needs landlord services separated from tenant consumption. The legal obligation is the reporting. The technical constraint comes from how the site is split: this part of the energy transition is played out in the distribution board.
Approved Document L and CIBSE TM39: metering by end use in new buildings
In England, Approved Document L (Volume 2) expects new non-domestic buildings, and existing ones where fixed building services are provided or extended, to be sub-metered so that at least 90% of the annual consumption of each fuel can be assigned to an end use. Each tenant's consumption must be monitored separately, and buildings over 1,000 m² need automatic meter reading. It is a construction requirement, not a voluntary standard. Nothing applies retrospectively to existing buildings where no work is done. Detailed guidance on which end uses to separate is in CIBSE TM39 Building Metering and Monitoring (2026), which replaced the 2009 edition.
Approved meters (MID): required for recharging, optional for control
In Great Britain, legal metrology for active electrical energy meters falls under the Measuring Instruments Regulations 2016 (SI 2016/1153), which implemented the EU Measuring Instruments Directive (MID)[2][2]Regulation and standardsGOV.UK, “Measuring Instruments Regulations 2016: Great Britain”, guidance on SI 2016/1153, which implemented Directive 2014/32/EU (MID), updated 24 March 2025See in sources ↓. A sub-meter whose reading is used to recharge electricity to a tenant must be an approved meter, kept accurate, under a written agreement. Internal monitoring does not need one.
A UK-approved meter carries the UKCA marking with the letter M and the year; a MID meter carries the CE marking, the M and year, then the notified body number. Both markings are accepted in Great Britain. A meter with type examination only (module B) is not approved for billing. It still has to be installed correctly: the approval covers the instrument, not its installation.
Mandatory, useful, not applicable: the rules one by one
This table separates the regulatory obligation from what is a matter of choice, to compare the effect of each rule on your metering strategy.
| Rule | What it requires | What it does not require | Consequence for the metering strategy |
|---|---|---|---|
| ESOS | Audit of at least 95% of total energy consumption on verifiable data | No sub-meter | Verifiable meter data for the sites audited |
| Part L BACS (> 180 kW) | Continuous monitoring, logging and analysis of energy use, detection of HVAC efficiency losses[1][1]Regulation and standardsGOV.UK, “Approved Document L, Volume 2: buildings other than dwellings”, 2021 edition incorporating 2023 amendments (England), §5.17 energy sub-meters and §6.66–6.73 building automation and control systemsSee in sources ↓ | No class, no number of meters, no data retention period | Metering granularity built into the BMS chain |
| Approved Document L metering | 90% of each fuel assigned to end uses, tenant metering, AMR above 1,000 m², in new buildings and works | Nothing retrospective on existing buildings without works | Check the metering delivered at handover |
| Measuring Instruments Regulations (MID) | Approved meter for any recharging to a third party[2][2]Regulation and standardsGOV.UK, “Measuring Instruments Regulations 2016: Great Britain”, guidance on SI 2016/1153, which implemented Directive 2014/32/EU (MID), updated 24 March 2025See in sources ↓ | Nothing for internal monitoring | Approved meter on recharged points |
| BREEAM Ene 02 (voluntary) | Sub-metering so that at least 90% of each fuel is assigned to end uses; through a BMS above 1,000 m²[3][3]Regulation and standardsBRE, “BREEAM UK New Construction 2014”, Ene 02 Energy monitoring (sub-metering of end uses and tenanted areas)See in sources ↓ | Nothing outside an assessed project | Sub-meters with pulse output or open protocol, labelled by end use |
So meter what your reporting (ESOS, DEC) and tenant recharging require. The rest is good practice: each additional meter is chosen for the decision it informs, not to complete an installation.
What to sub-meter and at what level: the metering architecture
Metering by end use or by zone: two ways of reading the building
Metering by end use answers the energy engineer's questions: HVAC, lighting, small power, process. It is also the reading a Part L BACS needs to benchmark the building and detect HVAC efficiency losses.
Metering by zone or by occupier serves tenant recharging and the separate monitoring of each tenant expected by Approved Document L.
In a distribution board, these two grids rarely line up. A single outgoing circuit often feeds both the lighting and the small power of a whole floor. In commercial sub-metering, the circuit structure decides, not the specification.
Which end uses and zones should be sub-metered first?
There is no universal list. Three criteria are enough to choose the points to equip. First, the presumed weight of the end use in the site's energy consumption: HVAC, hot water production, server room. Next, whether there is a decision to make: recharging, a savings measure or reporting. Finally, feasibility in the board. Equipment wired on a mixed circuit costs more to isolate than an EV charger already alone on its own circuit.
How many sub-meters for an office building?
The answer depends on the number of outgoing circuits on the main LV switchboard, then in the distribution boards. Add the number of tenants and the end uses to isolate. In other words, you have to look at the boards.
Adding meters to an electrical installation without a defined metering level has the opposite effect. You end up with hundreds of points and nobody knows which ones are reliable. A meter nobody reads is one meter too many.
From sub-meter to reporting: the chain the data passes through
Between the meter and the decision, the data passes through seven stages, and each one can degrade energy data quality. The diagram below follows them in order, from the main meter (the supplier's smart or half-hourly meter) to ESOS or DEC reporting, tenant recharging or IPMVP measurement. Each card carries the question to ask at that stage of the chain. They all come down to four points: who reads the data, at what time step, where it is logged and who guarantees the reconciliation between the sum of the sub-meters and the main meter.
From main meter to reporting: seven stages, one question at each
The data passes through seven stages before it serves a decision. Select a stage: the question at the bottom of each card is the one you must be able to ask.- 1Supplier Main meter Identified by its MPAN. Half-hourly data comes through your supplier, for the whole supply point, never per zone. Your questionWho retrieves this data, and at what time step?
- 2Site Main LV switchboard and distribution boards Each outgoing circuit is a possible metering boundary. The single-line diagram says what it feeds. Your questionDoes the single-line diagram still match the actual board?
- 3Measurement Sub-meters By end use, by zone or by occupier. Direct connection or current transformer depending on the circuit's current. Your questionWhich decision does this point inform, and who will read its data?
- 4Data transfer Transfer method LCD screen reading, pulses, Modbus, M-Bus or LoRaWAN. Each method has its weak spot. Your questionHas the pulse value or the register map been checked?
- 5Collection Controller / data logger A small industrial computer without a screen collects and timestamps the values before passing them on. Your questionWhat happens to the data when communication drops?
- 6Trend logging BMS supervisory system It names, stores and displays the points. Its logging interval determines what remains usable. Your questionWhere is the data logged, and for how long?
- 7Binding use Reporting ESOS or DEC reporting, tenant recharging, savings measured under IPMVP. Your questionWho guarantees reconciliation between the sum of the sub-meters and the main meter?
In practice, the stage most often left without an owner is precisely this reconciliation check, highlighted in yellow. The integrator answers for the wiring and the FM contractor for the supervisory system. The energy management tool merely displays what it receives: nobody reconciles the main meter total with the sum measured downstream.
Questions to ask the integrator before approving the metering strategy
Here are seven questions to ask before approving the installation. They are rarely asked for you:
• Which metering level do you use: end use, zone or occupier? • How does each point reach the supervisory system? • At what time step is the data recorded? • Where, and for how long, is it logged? • What point naming convention do you apply? • What reconciliation test at handover is planned? • Who checks the meters over time?
A metering strategy is easier to correct on paper than after commissioning. Our BMS advisory provides a second opinion before any hardware is ordered.
Installing sub-meters in an occupied building, then checking they measure correctly
Auditing what exists and identifying the circuits to meter
Before installing a sub-meter, take stock of those already in place. There are often more than you think. Some were installed during a fit-out, others forgotten at handover, and a few are not even connected. For each meter in place, record its actual connection and the circuit it measures. Then compare the single-line diagram with the target metering level. This audit reveals the circuits that still have no meter.
Location and connection: DIN rail, direct connection or current transformer
The sub-meter is mounted on a DIN rail, in the distribution board that feeds the metered circuit. It sits downstream of the main switch.
Up to the meter's current rating, connection is direct. Above it, measurement uses a current transformer fitted around the conductor. The choice between single-phase and three-phase follows the circuit itself: a three-phase circuit calls for a three-phase meter.
Who can install a sub-meter, and under what rules?
To install a sub-meter, use a competent electrician who applies the wiring rules in force. Nothing needs to be arranged with the supplier or the DNO: the metering stays private, downstream of the main switch. The new meter belongs to the site. Checking it over time is therefore the site's job too.
Can you sub-meter without a power cut?
Yes, in some cases. Split-core current transformers close around a cable without disconnecting it. The circuit keeps supplying electricity during installation. A new direct-connected meter, on the other hand, requires the circuit concerned to be switched off. In both cases, working near live parts of the electrical network is reserved for authorised, competent staff. This work is planned with the FM contractor.
What does the cost of a sub-metering point depend on?
You will not find any price here. The price of a sub-meter depends on its context: current rating, single-phase or three-phase, current transformers, communication module. Add the labour for the works, whether a shutdown is needed, integration into the supervisory system, configuration and then acceptance testing.
Our observation: the device weighs little compared with integration. A modular electricity meter costs less than the hours spent making its data reliable.
Reading the register on the LCD screen and comparing it with the supervisory system
First test, simple and cheap: read the register on the meter's LCD screen and note the time. Then compare it with the register logged in the supervisory system at the same time. The two must match. A reading lower than the previous day's betrays an untracked reset. The LCD display remains the physical reference, whatever real-time view is promised on screen.
Reconciling the main meter with the sub-meters
Reconciliation compares the sum of the sub-meters with the main meter over the same period. The two totals will never be equal. The unmetered share must nevertheless be explainable: circuits without meters, losses, landlord services without a sub-meter.
What matters is the stability of this gap from one month to the next, relative to the site's electricity consumption. A constant gap reflects the structure of the installation. A gap that moves, on the other hand, signals a fault somewhere in the chain.
Symptom, test, decision: the diagnostic grid for a suspect sub-meter
Faced with a suspect metering point, replacing the device is rarely the first useful step.
Did you know? An approved MID meter can read wrong once installed. Approval under the MID and the Measuring Instruments Regulations covers the instrument[2][2]Regulation and standardsGOV.UK, “Measuring Instruments Regulations 2016: Great Britain”, guidance on SI 2016/1153, which implemented Directive 2014/32/EU (MID), updated 24 March 2025See in sources ↓, not its wiring, its CTs or its configuration in the supervisory system.
The grid below starts from what you observe, suggests a simple test and then the decision that follows. Filter it by the situation that worries you: a disputed recharge, an inconsistent reported figure or savings impossible to demonstrate.
Symptom, test, decision: seven faults to tell apart
Start from what you observe. Each row gives the test to run before ordering any hardware. Your situation| Fault and symptom | Simple test | Decision |
|---|---|---|
| Read the register on the LCD screen, then check the circuit wiring and its presence in the supervisory system. | FixRestore the connection, then rebuild the history from a recorded reading. | |
| Check the continuity of timestamps over the whole reporting period. | RequalifyDocument each gap and restore data collection before the next reporting period. | |
| Monthly reconciliation, then an inventory of the supervisory points reading the same circuit. | FixDelete the duplicate point and recalculate the periods affected. | |
| Compare the reading taken on site with the register in the supervisory system at the same time. | ExcludeRemove the frozen period from the measurement boundary, then restore data collection. | |
| Check the timestamps around the peak: a catch-up after a communication outage can explain it. | RequalifyRequalify the values or exclude them from the calculation as long as the peak remains unexplained. | |
| Monthly reconciliation: track how the gap evolves, not just its value. | RequalifyStable gap: document it. Moving gap: work back up the chain point by point. | |
| Compare the LCD register with the supervisory system over the same period, then re-read the declared CT ratio. | FixCorrect the configuration, then requalify or exclude the distorted history. |
Start with the row that affects a binding decision: a point recharged to a tenant or a savings measurement boundary. Fixing, requalifying or excluding the point from the metering strategy is always better than keeping doubtful data. It is the condition for precise monitoring, the kind that identifies real savings.
What Foobot checks on your sub-meters
BMS advisory: making meters reliable and checking reconciliation
With our BMS advisory, we carry out a meter data reliability assignment. We look for disconnections, data gaps, duplicates, invisible drifts and unexplained peaks. We then check reconciliation between the main meter and the sub-meters.
The deliverable states which sub-meter is reliable, which to fix and which to exclude. Foobot sells neither meters nor installation work: our opinion has no hardware to place.
Savings measured under IPMVP on a sub-metered boundary
An energy saving measured under IPMVP, with weather correction by degree days (UK base 15.5 °C), requires a boundary whose metering has been verified. Without that, the baseline itself is wrong.
Sub-metering does not produce the saving, which comes from controls. It does, however, make energy performance independently verifiable.
Tracking your sub-meters with Foobot's free EMS
To track your sub-meters' consumption without waiting for a full supervisory system, Foobot's free EMS breaks consumption down by end use from your meter readings and history. It promises no savings. It shows where the energy goes and which point drops out.
Metering level, chain, reconciliation: the order that makes electrical sub-metering reliable
A sub-meter is only worth the reconciliation that checks it. First define the metering level, based on the decisions to be made. Then check each stage of the chain, from the distribution board to the supervisory system. Finally, check reconciliation with the main meter before any binding use: tenant recharging, ESOS or DEC reporting, or savings measurement.
To frame the next steps, review the Part L requirements for building automation and control systems. Then place metering within your energy review and your energy monitoring. The free Foobot EMS breaks your consumption down by end use. If your sub-meters do not reconcile with the main meter, let's review their reliability.
FAQ - electrical sub-metering
Why have an electrical sub-meter?
To share costs between tenants on a measured basis, optimise service charges and spot end uses that drift. In a multi-tenant building, metering each tenancy also makes the figures each occupier reports defensible, even though no UK rule requires a sub-meter in an existing building without works.
What are the limits of a sub-meter?
A sub-meter remains a complement to the main meter, never a substitute. It cannot be checked on its own. Without regular reconciliation, badly connected energy sub-metering produces plausible but wrong data for years.
How much does it cost to install an electrical sub-meter?
We do not give any price. The price of a sub-meter depends on the current rating, single-phase or three-phase, current transformers and communication. Labour and integration into the supervisory system often weigh more than the device itself.
Can a smart meter replace a sub-meter?
No. A smart or advanced meter is the fiscal meter installed for your supplier. Its data comes per MPAN, so for the whole supply point. It says nothing about the split by zone, by end use or by tenant.
Electrical sub-meter: what exactly are we talking about?
A device installed downstream of the main meter, owned by the site, that measures the active energy of one circuit in kWh. An electrical sub-meter is also called a check meter or secondary meter. It measures by end use, by zone or by occupier.
How does an electrical sub-meter work?
Mounted on a DIN rail, it measures the current of one circuit of the internal electrical network. Measurement is direct or via a current transformer. The device accumulates energy in kWh. Some models handle day and night rates.
Single-phase or three-phase sub-meter?
The metered circuit decides. A single-phase circuit calls for a single-phase electricity meter. A three-phase circuit, such as one feeding an AHU or a chiller, calls for a three-phase meter. Single-phase or three-phase, the choice is made circuit by circuit.
Is it legal to have an electrical sub-meter?
Yes. Private sub-metering downstream of the supply point is unrestricted and the device remains the site's property. To recharge a tenant, it must be an approved meter[2][2]Regulation and standardsGOV.UK, “Measuring Instruments Regulations 2016: Great Britain”, guidance on SI 2016/1153, which implemented Directive 2014/32/EU (MID), updated 24 March 2025See in sources ↓: it carries the CE or UKCA marking, the letter M with the year and, for a MID meter, the notified body number.
Sources and references
3 sources.- [1]GOV.UK, “Approved Document L, Volume 2: buildings other than dwellings”, 2021 edition incorporating 2023 amendments (England), §5.17 energy sub-meters and §6.66–6.73 building automation and control systems2021↑
- [2]GOV.UK, “Measuring Instruments Regulations 2016: Great Britain”, guidance on SI 2016/1153, which implemented Directive 2014/32/EU (MID), updated 24 March 202524/03/2025↑ 1 2 3 4
- [3]BRE, “BREEAM UK New Construction 2014”, Ene 02 Energy monitoring (sub-metering of end uses and tenanted areas)2014↑