The instrumentation quote for a metering strategy often arrives before anyone has checked the meters that are already running. Yet a commercial building has dozens of them, plus the BMS (building management system) points and the supplier's bill. Nobody knows which energy consumption figure is right, or which one decisions are based on. A reliable energy metering strategy is built in three stages: inventory the existing meters, check their data, and only then buy the missing sub-metering.
What is a metering strategy and what is it for in a commercial building?
A definition: the register of meters and their data
The energy metering strategy is the document that lists a site's meters, what each one measures and how its data is collected. It starts from the main meter, the fiscal meter at the supply point that your supplier uses to bill your energy. It is a tool for managing consumption measurement, not to be confused with the ISO 50001 energy measurement plan, which BS EN 17267 helps to build.
What should a metering strategy contain?
The strategy lists each meter, its measuring system and the chain that carries its data, as a tree per utility (electricity, gas, water). This is the logic of multi-utility energy metering that every audit reviews. Here is a metering strategy example for an office building:
- Electrical metering plan: supply intake, then the main low-voltage switchboard (main LV switchboard)
- HVAC, lighting and small power circuits, one sub-meter per end use
- Gas boiler room, then the heating hot water loop and its equipment
- Water sub-meter per functional zone
This metering diagram is kept in digital format, with its gas metering and heat meter branches.
Breaking down consumption by end use, by zone and by occupant
Sub-metering means measuring downstream of the main meter, by end use, by zone or by occupant. Recharging energy costs to tenants calls for an approved (MID/MIR) meter: in Great Britain, a landlord who resells electricity to tenants must use a meter approved under the Measuring Instruments Regulations 2016 and keep it accurate[2][2]RegulationGOV.UK, “Electricity meter certification”, guidance on certified and approved meters, including secondary metering by landlords who resell electricitySee in sources ↓.
A building metering strategy also supports decisions by functional zone: electrical sub-metering pinpoints where energy can be saved. By occupant, people counting relates consumption to actual occupancy.
How do you build a metering strategy for an existing site in 5 steps?
Step 1: define the context and the decisions metering must inform
Setting up a metering strategy starts with the decisions it must inform. Recharging a tenant, reporting for ESOS or a Display Energy Certificate, controlling HVAC or proving a saving do not call for the same points. Defining the context means setting the objective of the approach, then the target EnPIs (energy performance indicators). The four key steps that follow flow from it.
Step 2: inventory the meters in place, from the supply point to the BMS points
The baseline survey starts from the supply identifiers printed on your energy bills. For electricity, that is the MPAN (Meter Point Administration Number, 21 digits, whose 13-digit core identifies the supply point rather than the meter). For gas, it is the MPRN (Meter Point Reference Number).
The fiscal meter already tells you a great deal. A half-hourly meter, mandatory on sites whose demand exceeds 100 kW, records the load profile, the series of average demands measured at regular intervals. It also records the maximum demand reached, to compare with the Agreed Supply Capacity. Add the energy exchanged without being consumed, measured in kVArh, which comes under power factor and reactive power.
This data comes from your supplier, not from a national network portal: any non-domestic customer can ask for up to 12 months of smart or advanced meter data free of charge, with a reply within 10 working days. Reading it means knowing the supply's profile class and whether it is settled half-hourly. It also means knowing its network charges (DUoS and TNUoS, regulated by Ofgem). Then come the physical sub-meters and the points logged in the BMS, the last link for assessing the starting situation.
Step 3: check what each meter really measures
A meter that counts wrong costs more than a missing meter, because decisions are made on its data.
What to check before drawing up the strategy:
- The sum of the sub-meters reconciles with the main meter.
- Volumes match the supplier's bill.
- Histories remain continuous over a representative period.
These checks reveal four faults. A meter is disconnected from the supervisory system, the history has gaps, the same point is reported twice by the BMS and by automatic meter reading. The most insidious are invisible drifts, such as a wrongly entered pulse value in pulse metering. The diagram below follows the data link by link, from the meter to ESOS, DEC or NABERS UK reporting.
- Typical lossWrongly entered pulse value Ask the FM contractorWho entered the pulse value, and when?
- Typical lossWrong address or mapping Ask the FM contractorDoes the point address match the right meter?
- Typical lossTrend logging interrupted Ask the FM contractorSince when has this point stopped being trend-logged?
- Typical lossDouble-counted aggregation Ask the FM contractorIs this volume counted twice?
Put these two questions to the FM contractor exactly as they stand. Who entered the pulse value? Since when has this point stopped reporting? Without a written answer, consumption measurement remains a technical assumption. Energy data quality, the foundation of all energy metering, is decided here, well before real time.
Step 4: fill the missing points and choose the measuring equipment
Once the existing set-up has been checked, you fill only the gaps that matter. Measuring equipment often comes down to an electrical sub-meter, also called a submeter or check meter, fitted on a current transformer (CT). A power meter covers several outgoing circuits of the same board.
Then comes setting up communication. Three families coexist: wired bus, Modbus or M-Bus (the latter defined by EN 13757, published in the UK as BS EN 13757[3][3]Standards and protocolsCEN, “EN 13757” (published in the UK as BS EN 13757), communication systems for meters (M-Bus)See in sources ↓), LoRaWAN radio and automatic meter reading (AMR). The solution to choose is the one the supervisory system can already read, with no extra gateway to maintain.
Step 5: use the data and keep the strategy up to date
From readings to dashboards, every indicator must trigger an action: shifting an optimal start time, correcting a setpoint. An expensive dashboard that only shows the past makes a poor monitoring tool.
The strategy, kept in digital format, is updated after works, refurbishment or the arrival of a new tenant. Otherwise consumption monitoring is wrong from the following year.
Metering strategy, BMS and regulations: the meter says how much, the BMS says why
What the BMS already logs without appearing in the metering strategy
The supervisory system trend-logs points that are missing from the strategy: flow and return temperatures, run status, setpoints, flow rates. This is energy management data lying dormant in the controllers, rarely exported or analysed. A BMS metering strategy links it to the measurement system without installing a single extra meter.
Cross-referencing meters and BMS points, end use by end use
A meter on its own gives a volume. Cross-referenced with supervisory points, it becomes a diagnosis: the meter says how much, the BMS says why. The table below shows four cross-checks we carry out on site, end use by end use.
| What a meter measures | What the BMS already logs | What you deduce by cross-referencing the two |
|---|---|---|
| Boiler room The gas consumed by the boiler room. |
Flow and return temperatures, burner status. | The boiler room's actual efficiency, read from its own histories. |
| AHU The electricity consumed by an air handling unit. |
The airflow setpoint and operating hours. | An optimal start that is too early: the AHU runs before occupants arrive. |
| Chiller The chiller's electricity. |
Outside temperature, corrected with degree days. | A seasonal drift, visible from one summer to the next in comparable weather. |
| Water loops The energy of the heating hot water and chilled water loops. |
Loop temperatures. | The deviation from setpoint, loop by loop. |
These readings only hold if the meters have passed step 3. A boiler room efficiency calculated on a wrong pulse value invents a drift that does not exist. Energy consumption miscounted on the heating hot water loop in turn distorts any reading of energy performance.
ESOS, DECs and NABERS UK: what reporting expects from your meters
No UK regulation requires an existing commercial building to hold a metering strategy, or to cut its measured consumption. What consumes your meter data is reporting: ESOS assessments, based on verifiable consumption data over 12 months, SECR reports, NABERS UK ratings and, for public buildings, the Display Energy Certificate (DEC), which needs 365 days of bills, meter readings or half-hourly data covering at least 95% of consumption[4][4]RegulationGOV.UK, “The government methodology for operational ratings, Display Energy Certificates and recommendation reports”: 365-day assessment period, bills, meter readings or half-hourly data, at least 95% of consumption metered or estimated within the permitted limitsSee in sources ↓.
A metering strategy built for reporting makes those figures defensible: each reported volume traces back to an identified meter. Without it, a DEC or an ESOS assessment rests on apportionment keys that nobody can check. A new building, by contrast, should arrive already sub-metered by end use, as the metering provisions of Approved Document L expect in England: at least 90% of each fuel assignable to an end use, following CIBSE TM39.
How many sub-meters do you need, who writes the strategy and who keeps it up to date?
One measuring point per decision, not per piece of equipment
Before counting sub-meters, ask which decision each point informs. The following table asks the question for four common end uses.
| End use | What decision does this point support? | What frequency is enough? | What does it cost to keep the data reliable? |
|---|---|---|---|
| HVAC | Correct optimal starts, setpoints and schedules | Hourly or finer | High: mapping rechecked after every intervention |
| Lighting | Spot lighting left on outside occupied hours | Hourly | Low: check of schedules |
| Tenant recharging | Apportion charges between tenants | Daily | Medium: approved (MID/MIR) meter, jointly witnessed readings |
| Water | Detect a leak | Daily | Low: pulse continuity test |
A point with no decision behind it adds data to maintain, never a management tool.
Should you measure every 15 minutes, hourly or daily?
The frequency depends on the decision. A daily reading is enough for recharging, as it is for consumption tracking in monthly reporting. HVAC control requires hourly intervals or finer. Control that acts every 15 minutes, 24/7, needs measurement at the same pace, close to real time.
What a metering strategy costs and where fine sub-metering stops paying off
No list price holds: the budget depends on what the inventory reveals. Redoing a mapping costs little; fitting measuring equipment into a full switchboard costs more.
On a small commercial site, the payback period of fine sub-metering lengthens markedly. It is then better to optimise your consumption through schedules and setpoints, guided by an energy audit, before widening the project.
What Foobot brings to a metering strategy
Meter data reliability: putting existing data straight
At Foobot, BMS advisory (independent support for building owners on their building management system) begins where the strategy ends: checking that each point tells the truth.
Meter data reliability is a service in its own right. It deals with disconnections, data gaps, duplicates, invisible drifts and unexplained peaks, in the actual histories, before your first dashboards.
BMS advisory: reviewing a metering strategy before signing the instrumentation quote
A real-estate department, an asset manager or a property manager often decides without in-house BMS expertise. Our BMS advisory sells neither meters nor platforms: we review the metering strategy before the instrumentation quote is signed. Each proposed point must answer a decision, on that specific building, with data that can be maintained.
AI Control: savings measured under IPMVP on actual histories
AI Control only comes in if the complexity of the building justifies it. Its method follows three steps: audit the BMS, learn in a digital twin, then control every 15 minutes, 24/7.
Our software integrates over BACnet or LonWorks (LON), two open communication protocols between building controllers. It connects through a multi-protocol controller or directly through the supervisory system, with no added hardware. Deployment is committed over 12 months, with savings measured under IPMVP.
Before the first meter, the first check
A useful metering strategy does not start with the meter supplier. It starts with an inventory of what is already running, then with a check of each point, from meter to reporting. Sizing comes last, matched to the decisions to be made.
To go further, compare your strategy with the ISO 50001 energy measurement plan if you are aiming for ISO 50001, then list the data an EMS needs (energy management software): the free Foobot EMS then lets you track it. Start by checking what your meters really measure.
FAQ - Metering strategy
What is a metering strategy?
It is the map of a site's meters: where they are, what they measure and how their data reaches the supervisory system. It lets you decide on verified figures rather than on the supplier's bill alone.
What are the objectives of a metering strategy?
Spot an energy drift before it reaches the bill. Recharge tenants using approved (MID/MIR) meters. Set a consumption baseline that is then used to prove a saving or to decide on an investment.
Who needs a metering strategy?
No regulation requires a metering strategy as such, and nothing obliges an existing commercial building to add sub-meters outside works; ESOS, SECR and DECs simply rely on meter data. In England, Approved Document L expects new non-domestic buildings, and existing buildings where fixed building services are installed or extended, to be sub-metered so that at least 90% of each fuel can be assigned to an end use, with automatic meter reading above 1,000 m²[5][5]RegulationGOV.UK, “Approved Document L, Volume 2: buildings other than dwellings”, 2021 edition incorporating 2023 amendments, §5.17 (energy sub-meters) and §6.66-6.67 (BACS above 180 kW)See in sources ↓. It also requires a building automation and control system (BACS) in new buildings whose heating or air-conditioning output exceeds 180 kW; the 2026 edition, in force from 24 March 2027, keeps both provisions[6][6]RegulationGOV.UK, “Approved Document L, Volume 2: buildings other than dwellings”, 2026 edition (Future Buildings Standard), §4.19 (metering) and §5.76-5.77 (BACS), in force from 24 March 2027See in sources ↓.
What is an energy metering strategy?
An energy metering strategy covers all the site's utilities: electricity, gas, heating hot water, chilled water and heat supplied by a heat network. For each one, it specifies the meter, the end use measured and the data chain up to reporting.
How do you build a metering strategy?
In five steps: define the context and the target decisions, inventory what exists, check each meter, add only the useful points, then use the data and keep the strategy up to date. Setting up a strategy follows this order, never the reverse.
Metering strategy vs energy measurement plan: are they the same thing?
No. The metering strategy lists a site's meters. The energy measurement plan, as defined by BS EN 17267, which supplements ISO 50001 energy data collection, organises measurement to serve the EnPIs of an energy management system.
Is BS EN 17267 mandatory?
No, it is a voluntary standard[1][1]Standards and protocolsBSI, “BS EN 17267 Energy measurement and monitoring plan. Design and implementation. Principles for energy data collection”, 2019, voluntary standardSee in sources ↓. It helps an organisation working towards ISO 50001 certification to structure its measurement. No regulation requires it for a commercial building, whatever its size.
What budget should you plan for?
The budget depends on what the inventory reveals: mostly configuration on a site with reliable meters, hardware on a site with gaps.
Should you measure every 15 minutes, hourly or daily?
The frequency depends on the decision. Daily is enough for recharging, hourly for tracking HVAC, quarter-hourly for control that acts at that pace.
How do you account for influencing factors (weather, production, occupancy)?
Weather is corrected with degree days (in the UK, usually on a 15.5 °C base). Occupancy is taken into account through people counting or schedules, production through activity volumes. Without this normalisation, a mild winter looks like a saving.
How do you build a metering strategy for an existing industrial site?
The method stays the same: inventory, then checks. On an industrial site, the inventory also separates process uses from building uses, because their decisions differ. Sizing then follows the trade-offs actually expected.
What is a metering strategy audit?
It is a critical review of the existing strategy: meters in place, data that actually comes through, consistency with the supplier's bill. It complements an energy audit, such as an ESOS assessment, on a commercial building as on an industrial site.
Sources and references
6 sources.- [1]BSI, “BS EN 17267 Energy measurement and monitoring plan. Design and implementation. Principles for energy data collection”, 2019, voluntary standard↑
- [3]CEN, “EN 13757” (published in the UK as BS EN 13757), communication systems for meters (M-Bus)↑
- [2]GOV.UK, “Electricity meter certification”, guidance on certified and approved meters, including secondary metering by landlords who resell electricity06/11/2025↑
- [4]GOV.UK, “The government methodology for operational ratings, Display Energy Certificates and recommendation reports”: 365-day assessment period, bills, meter readings or half-hourly data, at least 95% of consumption metered or estimated within the permitted limits11/11/2026↑
- [5]GOV.UK, “Approved Document L, Volume 2: buildings other than dwellings”, 2021 edition incorporating 2023 amendments, §5.17 (energy sub-meters) and §6.66-6.67 (BACS above 180 kW)2021↑
- [6]GOV.UK, “Approved Document L, Volume 2: buildings other than dwellings”, 2026 edition (Future Buildings Standard), §4.19 (metering) and §5.76-5.77 (BACS), in force from 24 March 202724/03/2026↑