Structure your energy metering utility by utility: electricity, gas, heat, water, steam. Meters, conversion to kWh and tests that prove the data is reliable.

Adrien Lafond
21 min read
Illustration: counting several energy carriers in one building and bringing them to a single unit

A Display Energy Certificate needs every fuel the building uses, over a full 365-day period[1][1]RegulationGOV.UK, “The government methodology for operational ratings, Display Energy Certificates and recommendation reports”, DESNZ guidance (365-day assessment period, accepted meter data, 95% metered or estimated)See in sources ↓. Electricity can come in as half-hourly data from the fiscal meter, once your supplier makes it available. Heating is still often read by hand. So your consumption data arrives incomplete at reporting time.

Energy metering means measuring every utility a building consumes and getting that data to whoever makes the decisions. We set out which utilities to meter, how to bring each one back to kWh and how to check that actual consumption holds up.

Building energy metering: what a meter measures and what the rules require

Main meter, energy sub-metering and metering strategy

A site's energy meters are organised on three levels. The main meter is the fiscal meter at the supply point, used to bill the energy. It is installed and operated on behalf of your supplier, not by the network operator. Next comes energy sub-metering: measuring downstream of the main meter, by end use, by zone or by occupier. Each sub-meter, a device owned by the site, measures the consumption of one specific branch.

It all still has to be linked together. The metering strategy is the document that lists a site's meters, what each one measures and how its data is collected. It is not the same as the ISO 50001 data collection plan, often called the energy measurement plan. Without it, nobody knows which meter to connect to which supervisory system.

How does an energy meter measure electricity, heat or gas?

From the old spinning-disc meter to the new generation of smart meters, the electrical operating principle has not changed. Everything starts from voltage and current measurements.

Their product gives active power, which the device integrates over time to obtain kWh of electrical energy. For heat, the logic changes: a flow rate multiplied by a temperature difference. Gas, for its part, is metered by volume. Along the way, the disc driven by a magnetic field gave way to a digital display, then to the smart meter.

Why are the utilities that heat the building the worst metered?

On the electricity side, the smart or half-hourly fiscal meter and the electrical sub-meter deliver a load profile. Gas, heat and hot water are read by hand. Sometimes not at all. Communicating meters were fitted to electricity first.

What works for a house does not work for an office floor. A company's heating runs through several utilities and several circuits that nobody has linked together. Its energy consumption therefore remains an estimate.

DEC, ESOS, NABERS UK: every fuel counted from a full year of data

A Display Energy Certificate is based on 365 days of consumption, taken from utility bills, a robust and verifiable schedule of meter readings or half-hourly data[1][1]RegulationGOV.UK, “The government methodology for operational ratings, Display Energy Certificates and recommendation reports”, DESNZ guidance (365-day assessment period, accepted meter data, 95% metered or estimated)See in sources ↓. At least 95% of the consumption must be metered, or estimated within the permitted limits, and only supplier estimates are accepted, flagged on the certificate[1][1]RegulationGOV.UK, “The government methodology for operational ratings, Display Energy Certificates and recommendation reports”, DESNZ guidance (365-day assessment period, accepted meter data, 95% metered or estimated)See in sources ↓. Energy metering drives this rating, and ESOS assessments rest on the same verifiable consumption data. Energy suppliers' bills do not say which end use consumes. An end use that is not metered separately cannot be deducted, and without sufficient data there is no DEC at all. In a new building, Approved Document L metering guidance already expects sub-metering so that at least 90% of each fuel can be assigned to an end use.

Which utilities should be metered in a building and how do you bring their consumption back to kWh?

Electricity: the best-instrumented utility in the building

On the network side, the fiscal meter fitted for your supplier measures what the electricity supplier bills, against the site's Agreed Supply Capacity. Smaller non-domestic supplies (Profile Classes 3 and 4) are offered a smart meter. Sites above 100 kW of demand must be half-hourly metered. Each supply point is identified by its MPAN.

Downstream, each outgoing circuit of the electrical installation gets a single-phase or three-phase sub-meter, clipped onto a DIN rail. Beyond the current a meter can take directly, a current transformer steps down the current being read: this is the CT. Electric vehicle chargers in the car park now belong in electrical sub-metering too.

Gas: a meter in m³ for energy billed in kWh

Gas arrives through the distribution network. The supplier's meter measures it in m³ (in cubic feet on older imperial meters) at the supply point identified by its Meter Point Reference Number (MPRN). The energy supplier, however, bills in kWh.

In the plant room, the sub-meter is often missing. The boilers' actual consumption is then deduced from the main meter, ancillary uses included. Gas metering in the plant room has its own dedicated page.

Which meters for heating and cooling?

A heat meter combines a flow meter with two temperature sensors, one on the flow, the other on the return. A calculator, a small dedicated computer, derives the energy from them on the same operating principle.

This device is fitted on each hot water or chilled water circuit. It meters the heat produced by a heat pump separately from the electricity it draws. Heat networks and district cooling multiply these supply points. Buffer vessels and storage tanks also blur the instantaneous reading of the thermal energy meter.

Should water be included in an energy metering strategy?

Yes, but not for the water itself. Water metering picks out domestic hot water, which carries energy. It also flags top-ups in hydronic circuits and leaks, often a sign of thermal drift.

The search almost always starts with a meter reading that keeps turning overnight. A water sub-meter per circuit is enough to isolate this parasitic consumption.

Utility by utility: unit, meter, conversion and use of the data

Types of energy meter differ well beyond the unit displayed. The table below compares them utility by utility, on eight criteria. The diagram after it shows where the data gets lost between the meter and the decision.

Seven utilities · from meter to decision

What each utility measures and what its data lets you decide

Unit, meter, conversion to kWh, communication and real use of the data, utility by utility. Scroll the table to the right. Click a utility to highlight its column.
Criterion
Native unit kWh, from voltage and current integrated over time m³ at the meter (ft³ on older imperial meters) kWh calculated by the calculator from flow rate and temperature difference kWh calculated the same way on the chilled water circuit m³ Flow rate, to be completed by pressure and temperature Air volume, related to the compressor's kWh
Type of meter Smart or half-hourly fiscal meter on the network side; single-phase or three-phase DIN-rail sub-meters, with CTs beyond whole current connection Supplier's meter at the MPRN; plant room sub-meter often missing Heat meter: flow meter, flow sensor, return sensor and calculator Heat meter fitted on the chilled water circuit Sub-meter per circuit Flow meter combined with a pressure and temperature measurement The compressor's electricity meter
Conversion to kWh None: the measurement is already in kWh Calorific value shown on the supplier's bill, with a volume correction factor Flow rate × temperature difference × heat capacity of water Same formula, with the temperature difference reversed None for cold water; domestic hot water goes through a heat meter From pressure and temperature, never from flow rate alone Through the kWh drawn by the compressor
Usual time step Half-hourly data at the fiscal meter; load profile at the sub-meter Meter reading, often taken by hand Meter reading taken by hand or collected over a bus Meter reading taken by hand or collected over a bus Meter reading; a night-time reading reveals leaks Rarely read That of the compressor's electricity meter
Communication mode Modbus or pulse Pulse or LoRaWAN remote reading M-Bus or Modbus M-Bus or Modbus Pulse or LoRaWAN remote reading Modbus Modbus or pulse, via the electricity meter
Who reads the data The supplier and its data agents at the supply point; the supervisory system user for sub-meters The supplier's meter reader or data agent, then the supplier that bills The FM contractor, when the meter is read The FM contractor, when the meter is read The FM contractor The site's FM contractor Most often, nobody
What it lets you decide Split consumption by outgoing circuit; adjust the Agreed Supply Capacity Report consistent kWh; monitor the boiler plant Isolate a circuit; spot faulty control through a low temperature difference Spot a circuit or a production unit that is drifting Locate a leak or an abnormal top-up Relate the energy carried to an end use Measure what leaks really cost in kWh
What it does not let you do Say which end use consumes without sub-metering Separate the boilers from ancillary uses without a sub-meter A reliable instantaneous reading when buffer vessels and tanks store energy A correct calculation if the sensors are badly positioned Measure the energy of cold water, which carries none A correct energy figure from flow rate alone See leaks while the receiver masks them
The data chain: five links, four losses Each link can pass on a wrong value without triggering a single alarm.
Energy metering data chain, from meter to decision, with the points where data gets lost.
The table sticks to the mechanisms: no figures for factors or time steps, because these values depend on each site and each bill.

One row of the table weighs more than the others: who reads the data. The supplier, its data agents and the FM contractor do not look at the same type of meter or the same time step. At the end of the chain, whoever consults the supervisory system inherits consumption data degraded at every link in the diagram. All these readings still have to be brought back to a single unit, the kWh, starting with gas.

How do you bring all the utilities into one tool?

The BMS acts as the collection point and converts everything to kWh. Modbus, a serial or IP protocol, is fitted to most meters. M-Bus is the meter bus defined by the EN 13757 standard[2][2]Standards and protocolsCEN, “EN 13757”, communication systems for meters (M-Bus)See in sources ↓. LoRaWAN, a long-range, low-data-rate radio, carries remote meter reading. Finally, the pulse output sends one contact per quantity metered.

Two-way communication is useless if nobody logs the data for the user. New radio meters also raise the question of data protection on the network. To connect an isolated meter, you sometimes have to write a dedicated connector.

Do your utility meters produce usable data?

Disconnections and data gaps: the silent meter nobody notices

A cut M-Bus line, a frozen gateway or a meter reading that no longer moves is enough. The supervisory system then displays the last value received, without an alarm. Data gaps pile up across the metering network.

We come across sites with several hundred energy meters where nobody knows which ones are reliable. The technical manager rarely notices. Nor does the maintenance contractor.

The tests to run with your FM contractor before any decision

Data has to be tested before it is used to decide. Here are the five checks to run with your FM contractor, one per failure mode. Each card gives the symptom in the supervisory system, the test that settles it and the question to ask. Record your answer: the summary updates.

Self-assessment · 5 checks

Does your metering data hold up?

Open each card, run the test with your FM contractor, then record your answer. 0 checks answered out of 5
  1. Symptom in the supervisory system A frozen value, the same for days, without any alarm. The test that settles it Read the register on the meter itself and compare it with the last value received by the supervisory system. The question to ask your FM contractor “Which meters have sent nothing since the last reading? Who is alerted when a bus or a gateway goes down?”
    Has this point been checked?
  2. Symptom in the supervisory system Flat lines or jumps in the curve. Whole days missing from the history. The test that settles it Check that the time step is consistent: over a week, every expected interval must carry a value. The question to ask your FM contractor “What time step is logged for each meter? Where are these values stored?”
    Has this point been checked?
  3. Symptom in the supervisory system The sum of the sub-meters exceeds the main meter. Two curves overlap line for line. The test that settles it Add up the sub-meters and compare the total with the main meter over a week. The question to ask your FM contractor “Are two meters measuring the same outgoing circuit or the same loop? What pulse value is entered for each one?”
    Has this point been checked?
  4. Symptom in the supervisory system The gas kWh shown in the BMS gradually move away from those on the bill. The test that settles it Compare the gas converted in the BMS with the kWh billed by the supplier over the same period. The question to ask your FM contractor “What calorific value and correction factor are entered in the BMS? When were they last updated?”
    Has this point been checked?
  5. Symptom in the supervisory system A peak on the load profile, with no operating event to explain it. The test that settles it At night or at the weekend, read the meter of an outgoing circuit that is supposed to be off. The question to ask your FM contractor “Should this circuit consume outside occupied hours? If not, which manual override keeps it running?”
    Has this point been checked?
Summary Answer the five checks to read the summary.

Read this summary as a guide to priorities. Suppose the sum of the sub-meters matches the main meter over a week and the converted gas matches the bill. The usable data can then serve as a basis. On the other hand, a single “I don't know” answer is enough to postpone any decision based on this measurement.

Several boxes still on “not checked”? We test your meters one by one before their figures are used to decide on a works budget.

Make the BMS data reliable

Setting up an energy metering system that supports decisions

Which utility should you start with?

Start with the utility that carries the heating and the largest share of the bill. Then move on to the one the BMS already reads. In an office building, electricity is often metered before heating. A useful energy metering system corrects this imbalance first. Before choosing an energy meter, you choose the utility. That is where energy management really bears on energy consumption.

Installing an energy meter without losing the data along the way

To install an energy meter without losing its data, the work follows four stages. Point naming comes first, with a naming convention shared by the installer and the FM contractor. Then come connection to the BMS, handover and consistency tests. The electrical hardware, on a DIN rail or behind a current transformer, rarely causes problems. Naming, far more often. At Foobot, we specify and verify. We do not install meters.

A meter saves nothing: from the curve to the decision

A meter saves nothing. It supports decision-making, provided you first establish a consumption baseline corrected for weather and occupancy. Without it, no deviation can be read.

Improving energy efficiency then depends on using the data: correcting a setpoint, shifting an optimal start or switching off a forgotten circuit. Displaying an energy saving is not enough, you have to prove it. Energy sufficiency is measured in kWh avoided, not in meters installed.

What Foobot does with the meters already installed in your buildings

BMS advisory: make existing meters reliable before adding more

Our BMS advisory work starts where the checklist ends. We track down disconnections and test for duplicates. We also correct pulse values and document every point. On a site with several hundred meters, the goal stays simple: knowing which ones tell the truth.

Making meter data reliable comes before adding anything. A new meter commissioned on unreliable data only adds noise. This service gives the site manager a history they can defend.

Reading every utility from the existing BMS, with no added hardware

We read gas, heat, cooling, water and electricity with no added hardware. Reading goes through BACnet, the open BMS protocol, or through LonWorks (often shortened to LON), a field network for building automation. It is done via a multi-protocol controller or at supervisory system level. The work touches neither the electrical hardware nor the switchboards. That is where our software culture comes from: we design tools that genuinely connect to BMSs from different manufacturers. It is also the condition for any energy management that holds up.

Proving a heating saving with IPMVP and degree-day correction

A saving is proven with the International Performance Measurement and Verification Protocol, the IPMVP protocol[3][3]Standards and protocolsEfficiency Valuation Organization, “International Performance Measurement and Verification Protocol (IPMVP)”, measurement and verification of energy performanceSee in sources ↓. The protocol requires consumption to be adjusted for changing conditions, weather first: in the UK, this correction uses heating degree days, generally on a 15.5 °C base. Without this correction, a mild winter passes for a saving.

The Valeo case study, measured under the IPMVP protocol, shows -28.6% HVAC consumption (heating, ventilation and air conditioning). This result comes first from tuning the existing systems: our AI Control only steps in when there is real complexity to manage. A cost reduction you cannot prove will not stand up to an ESOS assessor.

Meter the heating before trying to reduce it

A building is metered utility by utility and each measurement is brought back to kWh of delivered energy. Only the fiscal meter and the approved sub-meters used to recharge tenants (Measuring Instruments Regulations 2016) fall under legal metrology. No regulation guarantees that your sub-meters tell the truth. Until heating is metered reliably, your consumption figures remain an estimate.

Check your readings against what ESOS, DEC or NABERS UK reporting will ask of them. If you are aiming for ISO 50001, compare them with your ISO 50001 energy measurement plan too. The free Foobot EMS then lets you monitor several utilities in one tool. Above all, have the data from your existing meters tested.

Meter data reliability

FAQ - building energy metering

How do I find out my site's current supply capacity?

The Agreed Supply Capacity, in kVA, appears on the bill and in the supply contract. It is a contractual figure, not a setting on the meter. On a half-hourly metered site, the data shows the maximum demand actually reached. In a commercial building, compare the agreed capacity with the peak demand seen in the supervisory system.

How do I calculate the supply capacity I need?

The capacity you need is read from the load profile. Note the peak demand reached over a year, winter included. If it stays well below the Agreed Supply Capacity, a reduction can be justified. It can only be reduced once every 12 months, and the capacity given up may not be available again later.

What does an electricity meter's power mean?

An electricity meter measures power from voltage and current values. Active power produces the electrical energy that is billed. Reactive power circulates without being consumed. The Agreed Supply Capacity, in kVA, caps the apparent power the site can draw.

What capacity does a heat pump or an EV charger need?

It all depends on the device and on the diversity of loads. What works for a house does not work for a commercial car park. Each EV charger or heat pump adds to the load profile. Check the margin before asking to raise the Agreed Supply Capacity.

Does changing capacity change my electricity contract?

Yes. A capacity change is requested from the network operator (DNO), often through your supplier or a consultant. It is a contractual change, not a setting on the meter. The network charges in your bill include a capacity charge per kVA of agreed capacity, per day.

What is the difference between a half-hourly and a non-half-hourly site?

A small non-domestic supply in Profile Classes 3 or 4 is settled on a standard profile, not on its own half-hours. Half-hourly metering is mandatory once a site's demand exceeds 100 kW. Market-wide half-hourly settlement is extending half-hourly data to all meters, with migration due to finish in May 2027.

How does an energy meter work?

An energy meter measures a physical quantity, then integrates it over time. For electricity, it multiplies voltage by current. For heat, it combines flow rate and temperature difference. The quantity of energy consumed follows, as explained in the first part.

What are the types of energy meter?

Types of energy meter follow the utilities: electricity, gas, heat, cooling, water, steam and compressed air. Each comes as a basic, advanced or communicating meter. The utility-by-utility table compares the unit, the conversion to kWh and the communication of these energy meters.

What is energy sub-metering?

Energy sub-metering means measuring downstream of the main meter, by end use, by zone or by occupier. The main meter is the fiscal meter at the supply point, used to bill the energy.

What are the benefits of smart meters?

The benefits of smart meters come down to the data: half-hourly load profile, remote reading and alerts. Yet a smart meter is only worth something if someone logs and reads that data. Radio data protection also comes into the choice.

How do you install an energy meter?

Installing an energy meter is a job for a qualified installer. The work follows four stages: point naming, connection to the BMS, handover and consistency tests. At handover, compare the meter's register with the value logged in the supervisory system.

Sources

Sources and references

3 sources.
Regulation1
  1. [1]GOV.UK, “The government methodology for operational ratings, Display Energy Certificates and recommendation reports”, DESNZ guidance (365-day assessment period, accepted meter data, 95% metered or estimated)11/11/2026↑ 1 2 3
Standards and protocols2
  1. [2]CEN, “EN 13757”, communication systems for meters (M-Bus)↑
  2. [3]Efficiency Valuation Organization, “International Performance Measurement and Verification Protocol (IPMVP)”, measurement and verification of energy performance↑
Energy newsletter

Get our articles on AI-driven HVAC control