Current transformers: how they work, how to choose, metering errors

Understand what a current transformer does, choose its ratio and accuracy class, and spot the CT errors that distort your sub-metering data.

Adrien Lafond
16 min read
Illustration: current transformers that make or break the accuracy of a meter

Your ESOS audit rests on 12 consecutive months of consumption data[1][1]RegulationGOV.UK, ‘How to comply with the Energy Savings Opportunity Scheme (ESOS) Phase 4’, guidance published on 30 July 2026: audit based on 12 consecutive months of energy consumption dataSee in sources ↓, yet nobody ever checks the current transformer (CT) that measured it. This component steps a high current down to a standardised secondary current of 1 A or 5 A[2][2]Standards and protocolsIEC, ‘IEC 61869-2:2012 Instrument transformers – Part 2: Additional requirements for current transformers’, edition 1.0 of 18/09/2012, supplemented by interpretation sheet IS1:2022 (published in the UK as BS EN 61869-2:2012)See in sources ↓, proportional to the primary current. That reduced image is what your electricity meter reads. Here is how a current transformer works, how to choose one and how to spot, in the data, the errors that distort its measurement.

Role, operation and sizing of a current transformer

Bringing a current of several hundred amps down to 1 A or 5 A

A current transformer, or CT, is an instrument transformer. As defined in the IEC standard, its secondary current remains substantially proportional to the primary current under normal conditions of use[3][3]Studies and reportsWikipedia, ‘Current transformer’See in sources ↓. The phase displacement between the two is close to zero. The secondary takes one of two standard values: 1 A or 5 A[2][2]Standards and protocolsIEC, ‘IEC 61869-2:2012 Instrument transformers – Part 2: Additional requirements for current transformers’, edition 1.0 of 18/09/2012, supplemented by interpretation sheet IS1:2022 (published in the UK as BS EN 61869-2:2012)See in sources ↓.

Why not connect the meter directly? The copper busbar of a main LV switchboard carries a current that no thin instrument cable could withstand. The CT passes on only a reduced image of it: the current value, divided by a fixed ratio. Above all, it provides isolation of the measuring circuit from the network. Its standardised secondary makes instruments interchangeable, from meter to protection relay, with an accuracy set by its class. Each CT has its own line in the site's metering strategy, with its ratio.

From primary to secondary current: induction and transformation ratio

The principle relies on electromagnetic induction[3][3]Studies and reportsWikipedia, ‘Current transformer’See in sources ↓. The primary winding is often just the cable or busbar passing through the core. The alternating current flowing in it creates a magnetic flux, channelled by the magnetic circuit. The secondary winding then delivers a proportional current.

The transformation ratio sets that proportion, just as the scale of a drawing sets the size of the model. Example: a 400/5 A CT has a ratio of 80, so 200 A on the primary side gives 2.5 A on the secondary side.

How do you choose a CT's ratio?

The rated primary current is matched to the actual current of the outgoing circuit, not to the circuit breaker rating. A 400/5 A CT fitted on a circuit that peaks at 40 A works at 10% of its rated current at peak. Off-peak, it drops below 5%, the threshold from which the error limits of measuring classes without an ‘S’ apply[2][2]Standards and protocolsIEC, ‘IEC 61869-2:2012 Instrument transformers – Part 2: Additional requirements for current transformers’, edition 1.0 of 18/09/2012, supplemented by interpretation sheet IS1:2022 (published in the UK as BS EN 61869-2:2012)See in sources ↓. Below that, its class guarantees nothing.

1 A or 5 A secondary and VA burden: cable length decides

The apparent power the CT can supply, called the rated output (or burden) and expressed in VA[2][2]Standards and protocolsIEC, ‘IEC 61869-2:2012 Instrument transformers – Part 2: Additional requirements for current transformers’, edition 1.0 of 18/09/2012, supplemented by interpretation sheet IS1:2022 (published in the UK as BS EN 61869-2:2012)See in sources ↓, must cover the measuring instrument and the secondary cables. Losses in those cables follow R × I²: for the same length, a 5 A secondary dissipates 25 times more than a 1 A secondary. The further the electrical sub-meter is from the CT, the more the 1 A standard becomes the right choice.

If the rated output is undersized, the CT saturates. The measurement then drops out at high loads, without a single alarm.

Which accuracy class for metering?

The accuracy class of a measuring CT reads 0.2S, 0.5S or 1: ±0.2%, ±0.5% and ±1% error at rated current[2][2]Standards and protocolsIEC, ‘IEC 61869-2:2012 Instrument transformers – Part 2: Additional requirements for current transformers’, edition 1.0 of 18/09/2012, supplemented by interpretation sheet IS1:2022 (published in the UK as BS EN 61869-2:2012)See in sources ↓. The ‘S’ extends the guarantee down to 1% of rated current[2][2]Standards and protocolsIEC, ‘IEC 61869-2:2012 Instrument transformers – Part 2: Additional requirements for current transformers’, edition 1.0 of 18/09/2012, supplemented by interpretation sheet IS1:2022 (published in the UK as BS EN 61869-2:2012)See in sources ↓, which matters for the fluctuating loads of a commercial building. A class 0.5S CT suits recharging energy to tenants, usually paired with an approved (MID/MIR) meter. Internal monitoring can make do with class 1.

Did you know? IEC 60044-1, still quoted in some specifications, was replaced in 2012 by IEC 61869-2[2][2]Standards and protocolsIEC, ‘IEC 61869-2:2012 Instrument transformers – Part 2: Additional requirements for current transformers’, edition 1.0 of 18/09/2012, supplemented by interpretation sheet IS1:2022 (published in the UK as BS EN 61869-2:2012)See in sources ↓, published in the UK as BS EN 61869-2. A specification that still quotes the old standard deserves a review before it goes out to tender.

Solid-core CT, split-core CT or Rogowski coil

The solid-core CT: the measuring core for permanent installations

A solid-core CT has a one-piece magnetic core, with the cable or busbar passing through it. Its continuous magnetic circuit makes it the most accurate measuring core of the three. The price to pay: a shutdown and disconnection of the outgoing circuit to install it. It remains the reference for new builds and for main LV switchboards in major refurbishments.

The split-core CT: fitting onto an existing cable without disconnecting it

A split-core CT (or split-core current transformer) opens in two and closes around an existing cable. Installation is non-intrusive: no shutdown on a live switchboard. The trade-off lies in the air gap, which disturbs the magnetic flux and degrades the accuracy class. The quality of the clamping then governs the current measurement at each installation.

From secondary current to consumption data

The metering chain: CT, meter or power meter, BMS, reporting

The CT secondary current passes through several links before becoming a kWh in a report. The CT ratio is first entered by hand into the meter or the power meter. The data then travels up to the BMS over Modbus, a serial or IP protocol very widely used on meters. The diagram follows this path link by link, all the way to the energy report.

The yellow dot marks the weak point of the measurement chain. An error entered at this point passes through the BMS and on into electricity reporting. No downstream link corrects it.

The invisible errors of sub-metering, fault by fault

The faults below trigger no alarm: the curve stays plausible and the meter keeps communicating. The table sets out five installation or configuration faults, their symptom in the supervisory system and the order of magnitude of the error on the current measurement.

Five CT faults that distort data without triggering an alarm Symptom in the supervisory system · order of magnitude · check to request
Fault found on the CTSymptom in the BMS front endOrder of magnitude of the errorWhat to check
Configuration
Wrong ratio entered in the meter
Credible curve, offset by a constant factor Ratio quotient: a 400/5 A CT entered as 200/5 A halves the consumption CT rating plate against the configuration
Wiring
P1/P2 polarity reversed
Negative power or energy not recorded Up to the whole channel, depending on the meter Positive power, channel by channel
Sizing
CT below 5% of rated current
Stable reading, outside the guaranteed range Not covered: a class 1 CT already allows ±3% at 5% of rated current Actual current against rated primary current
Sizing
VA rated output too low for the cable length
Peaks clipped at high loads Saturation, error not bounded by the standard VA budget of the meter and cables
Specification
Class 1 fitted where tenant apportionment required 0.5S
Discrepancies between tenants ±1% vs ±0.5% at rated current, ±3% vs ±0.75% at 5% Class shown on the rating plate
Error limits for classes 1 and 0.5S: IEC 61869-2, 2012 edition. Ratio error: quotient of the actual ratio and the declared ratio.

The first row sums up all the others: an accurate CT, wrongly declared, produces false data. An IPMVP measurement plan built on this metering proves nothing, since the baseline and the calculated savings inherit the same error.

What happens if a current transformer is fitted the wrong way round?

The CT carries standardised terminal markings: on the primary side, P1 towards the source and P2 towards the load; on the secondary side, S1 and S2[2][2]Standards and protocolsIEC, ‘IEC 61869-2:2012 Instrument transformers – Part 2: Additional requirements for current transformers’, edition 1.0 of 18/09/2012, supplemented by interpretation sheet IS1:2022 (published in the UK as BS EN 61869-2:2012)See in sources ↓. Fitted the wrong way round, it reverses the current seen by the meter. Depending on the model, the channel shows negative power or records nothing at all.

The check comes down to a positive power reading on each channel, with the load running. Another installation rule: a secondary is never left open under load[3][3]Studies and reportsWikipedia, ‘Current transformer’See in sources ↓, so it is short-circuited before any work.

How do you spot a wrong ratio in the data?

Reconcile the sum of the sub-meters against the main meter over a week. A constant ratio (×2, ×0.5, ×4) points to a CT ratio error rather than drift, which varies over time.

A step change on the day a transformer is replaced or a device reprogrammed gives away an entry error. Frozen meter readings, gaps and duplicates call for a different diagnosis: that of energy data quality.

After handover: checking the CTs nobody checks

Why do CTs drop off the radar once the snag list is closed?

The electrician installs the current transformer, the integrator enters the ratio, the FM contractor reads the data. Responsibility gets diluted: no one owns accuracy from end to end.

A handover that tests the meter's communication without testing its measurement lets everything through. The building owner is then left with only the installer's word to judge whether the measurement is accurate.

Five questions to ask your integrator or FM contractor

No need to open a supervisory system to question your installation. Here are the five questions to ask, each followed by what a wrong answer costs in operation. Tick them off as you go through them with your contact.

To ask your integrator or FM contractor

Five questions about your current transformers

Tick each question once asked. Under each one, what a wrong answer costs.
0/5 questions asked
No questions asked yet.

A vague answer counts as a no. Ask for the written record, rating plate by rating plate and channel by channel, before bringing in a third party to check.

What Foobot checks on the current transformers of a portfolio

Meter data reliability: wrong ratios, duplicates and invisible drift

Meter data reliability is one of the deliverables of our BMS advisory service. On each site, we reconcile meters against each other to uncover disconnections, data gaps, duplicates, wrongly declared ratios and unexplained peaks. Each anomaly is then traced back to the faulty link: CT, configuration, communication or supervisory system. The measurement becomes usable again before any calculation.

Handover and defects liability period: testing the measurement chain before the snag list is closed

During handover, we test the CT, meter and BMS chain under real load: declared ratio, current direction, consistency with the main meter. A tested measurement chain is demonstrated by readings. During the defects liability period, we follow remediation through to effective correction. The right time to contact us: before defects are signed off.

Savings measured under IPMVP on verified metering

An IPMVP baseline, normalised for degree days, is only as good as the accuracy of the meters that feed it. So we check the metering before putting a figure on anything. At Valeo, HVAC consumption fell by 28.6%, as measured savings under the IPMVP protocol. Energy savings can be proven, provided the meter tells the truth.

A current transformer is judged in the data, not on its rating plate

A transformer's rating plate says what it can do. It says nothing about what your BMS records. An accurate CT, wrongly declared, produces false data. No alarm will ever tell you.

Reconcile your sub-meters against the main meter, check the declared ratios, question your integrator. The ISO 50001 energy measurement plan then sets the measurements that matter for your performance. Repeat this consistency check between main meter and sub-meters after every change to the switchboard. Once the chain is verified, the free Foobot EMS takes over the monitoring. To have your data reviewed by a team that tests every link, let's talk.

Meter data reliability

FAQ - Current transformers

What should you never do with a current transformer?

Open the secondary under load. The CT imposes its current: with no circuit to close it, a dangerous overvoltage appears across the terminals[3][3]Studies and reportsWikipedia, ‘Current transformer’See in sources ↓. Shorting terminals make it possible to work on the meter without compromising the isolation of the measuring circuit.

How does a current transformer work?

By electromagnetic induction. The current in the primary winding, often a single cable passing through the core, creates a flux in the magnetic circuit. The secondary winding delivers a proportional current, set by the transformation ratio between primary and secondary[3][3]Studies and reportsWikipedia, ‘Current transformer’See in sources ↓.

What are the advantages of a Rogowski coil?

With no magnetic core, it does not saturate[3][3]Studies and reportsWikipedia, ‘Current transformer’See in sources ↓. Flexible and non-intrusive, it fits around wide busbars without a shutdown. It is used mainly for temporary measurement campaigns.

What are the different accuracy classes of current transformers for?

They match the accuracy criteria to the use. A class 0.5S CT serves tenant apportionment, class 1 internal monitoring[2][2]Standards and protocolsIEC, ‘IEC 61869-2:2012 Instrument transformers – Part 2: Additional requirements for current transformers’, edition 1.0 of 18/09/2012, supplemented by interpretation sheet IS1:2022 (published in the UK as BS EN 61869-2:2012)See in sources ↓. Protection requires an accuracy limit factor. IEC 61869-2 replaced IEC 60044-1 in 2012[2][2]Standards and protocolsIEC, ‘IEC 61869-2:2012 Instrument transformers – Part 2: Additional requirements for current transformers’, edition 1.0 of 18/09/2012, supplemented by interpretation sheet IS1:2022 (published in the UK as BS EN 61869-2:2012)See in sources ↓.

What is the difference between a current transformer and a summation current transformer?

A current transformer measures one conductor. A summation CT adds the secondaries of several CTs with the same ratio into a single measuring instrument. It avoids one meter per circuit, provided each CT is correctly wired and declared.

What is the role of a current transformer?

To bring a high current down to a standardised value of 1 A or 5 A[2][2]Standards and protocolsIEC, ‘IEC 61869-2:2012 Instrument transformers – Part 2: Additional requirements for current transformers’, edition 1.0 of 18/09/2012, supplemented by interpretation sheet IS1:2022 (published in the UK as BS EN 61869-2:2012)See in sources ↓, readable by a measuring instrument or a protection relay. It isolates that circuit from the network. Unlike power transformers, it does not supply any installation.

What are the three types of current transformer?

The solid-core CT, for permanent metering. The split-core CT, fitted without disconnection on a live switchboard. The Rogowski coil, reserved for measurement campaigns. The Hall-effect sensor, which also measures direct current, belongs to a different technology[3][3]Studies and reportsWikipedia, ‘Current transformer’See in sources ↓.

Sources

Sources and references

3 sources.
Studies and reports1
  1. [3]Wikipedia, ‘Current transformer’↑ 1 2 3 4 5 6 7
Energy newsletter

Get our articles on AI-driven HVAC control

One case study a month, on fine-grained control and its impact on building energy performance.