A power meter is an electrical measuring instrument that calculates, in real time, the electrical quantities of an incoming supply or an outgoing circuit. It is used to monitor and analyse the electrical network, then sends its values to the supervisory system.
Power, reactive energy, harmonics: everything is calculated. Yet this data often sits idle in the panel, because nothing brings it up to the BMS.
What is an electrical power meter?
A measuring instrument that calculates and communicates, beyond simple metering
Current comes in through a current transformer (CT), while voltage is connected directly. The power meter is installed at the head of the outgoing circuits that matter. It calculates active power in real time from these two signals, displays it, then transmits it over its communication link.
Its position should appear in the metering strategy, the document that lists a site's meters, what each one measures and how its data is collected. In the panel, the multifunction power meter usually comes as a DIN-rail device.
In the panel, nothing sets it apart from an energy meter. Yet a meter totals energy, a power meter calculates quantities. The first tells you how much electrical energy has passed through. The second lets you monitor how it passes through.
Which quantities does it measure, and what do they say about your installation?
The active and reactive power of an outgoing circuit are the first signs of overload. When the power factor deteriorates, reactive energy rises: see power factor and reactive energy. This energy, exchanged without being consumed by motors, transformers and power supplies and measured in kvarh, exposes a half-hourly metered site to reactive power charges.
Monitoring the total harmonic distortion of current then helps spot disturbances caused by variable speed drives and electronic power supplies. What is at stake is power quality. Four-quadrant measurement, on the other hand, is only justified when the site generates electricity, for example solar PV for self-consumption.
Energy meter, power meter or power quality analyser: which one for which need?
Three instruments, three depths of reading of the electrical network
An energy meter, a multifunction power meter and a power quality analyser read the same electrical network at three different depths. The table below helps you choose. It decides on the quantities you need, recharging to a tenant and the communication available, from pulse output to Modbus TCP.
| Criterion | MID/MIR-approved energy meter | Power quality analyser | Multifunction power meter |
|---|---|---|---|
| What it reads | Totalised active energy, in kWh. | Everything the power meter reads, plus event capture and detailed harmonic analysis. | Active, reactive and apparent power, power factor, reactive energy, harmonics. |
| Recharging a tenant | Yes: that is what it is for, thanks to its MID/MIR approval marking. | Only if the model carries MID/MIR approval marking. | Only if the model carries MID/MIR approval marking. |
| Communication | Pulse output or Modbus RTU, depending on the model. | Modbus RTU, Modbus TCP or BACnet, depending on the model. | Modbus RTU, Modbus TCP or BACnet, depending on the model. |
| Memory and trend logging | A cumulative register reading. The history depends on the supervisory system that reads it. | Event and waveform recording, depending on the model. | Internal memory on some models, to be downloaded or sent upstream. |
| Relative cost | The most affordable. | The highest. | Mid-range. |
| Where it goes | Secondary circuit, tenant area. | Main incomer or a circuit to diagnose. | Main LV switchboard and heavy circuits: HVAC, chillers. |
| What it is for | Recharging. | Diagnosing. | Monitoring and understanding. |
| What the instrument will never do on its own Shared limit |
Feed reliable monitoring without a supervisory system or a reconciliation check. | ||
The power quality analyser is for advanced functions: event capture, detailed harmonic diagnosis. For tracking consumption, it is oversized.
The last row is the most honest one. What the instrument will never do on its own is feed reliable monitoring without a supervisory system or a reconciliation check.
Commissioning: why an installed power meter can measure nothing correctly
Mounting, wiring and configuration: where errors creep in
A modular power meter is mounted on a DIN rail, inside the electrical panel. Next comes the wiring of the current transformer or of a current sensor such as a Rogowski coil. The CT ratio, that is the ratio between the CT's primary and secondary current, must then be set in the power meter. In a commercial building, this panel is often the main LV switchboard, where the power meter monitors the main outgoing circuits.
The error is arithmetic. A CT declared as 100/5 when a 200/5 is installed halves the measurement. Then come phase matching, which pairs each current with its voltage, and addressing on the bus.
The handover and operation checklist for a power meter
An installed power meter is not a power meter that has been handed over. Here are the eight points to check before treating it as such, each followed by the question to ask the installer or the FM contractor.
Eight points before treating a power meter as handed over
Point 5 sums up what is at stake: a reading on the panel display is not data. Without trend logging or comparison with the main meter, the value vanishes as soon as the panel door is closed.
Point 8 closes the loop. Without a commissioning record, nobody knows any more which measured parameters were validated, or by whom.
Do your power meters display values that your supervisory system does not log? We commission the metering chain point by point, from the CT to the trend curve.
How do you connect a power meter to the BMS or to an EMS?
Modbus RTU, Modbus TCP, BACnet or LoRaWAN: how data leaves the electrical panel
The Modbus protocol remains the most widespread communication route on these devices. A Modbus power meter outputs its electrical values over a serial link, Modbus RTU on RS485. It can also run over IP, in Modbus TCP or BACnet. A gateway then translates them for the BMS. In existing buildings without cabling, LoRaWAN, a long-range, low-data-rate radio protocol, avoids running a bus outside the electrical panel.
Modbus carries registers without describing them. Each product exposes its own map. What each value means is kept in a separate document, which you therefore need to hold.
Internal memory, LCD display, trend logging: why so many readings lie idle
Three situations keep recurring. First, the power meter whose internal memory has never been downloaded since handover. Then, the values read in real time on the display, then forgotten. Finally, trend logging that is missing because nobody thought to configure it.
In England, Approved Document L nevertheless requires energy monitoring from building automation[3][3]RegulationGOV.UK, ‘Approved Document L, Volume 2: Buildings other than dwellings’, 2021 edition incorporating 2023 amendments, BACS requirement above 180 kW (§6.66-6.73)See in sources ↓. A new non-domestic building whose heating or air-conditioning system has an effective rated output above 180 kW must have a building automation and control system able to continuously monitor, log, analyse and allow for adjusting energy use; the same applies when such a system is installed or replaced in an existing building above that threshold. There is no deadline for retrofitting the existing stock[4][4]RegulationGOV.UK, ‘Approved Document L, Volume 2: Buildings other than dwellings’, 2026 edition (Future Buildings Standard), in force on 24 March 2027, 180 kW BACS threshold retained (§5.76-5.84)See in sources ↓. Wherever the requirement applies, monitoring and analysis are no longer optional: a power meter that nobody reads is measuring for nothing.
What Foobot does with the data from your power meters
Making metering data reliable before using it
Our BMS advisory service tracks down disconnections, data gaps, duplicates and invisible drifts. Each fault has a consequence: a gap distorts the baseline, a duplicate makes a tenant recharge open to dispute.
This is the purpose of our Meter data reliability service. Without close monitoring of power meters, energy measurement remains a matter of self-declaration. We document every correction.
Bringing readings into the existing supervisory system, with no added hardware
At Foobot, we read electrical values where the BMS already gathers them. We go through the multi-protocol controller or the supervisory system, via BACnet or LonWorks, often shortened to LON, with no added hardware. For us, a power meter is therefore only usable if your BMS already reads it or can read it.
Starting from a measured baseline: IPMVP and degree-day correction
Once the data is clean, we establish a consumption baseline following the International Performance Measurement and Verification Protocol (IPMVP). It is corrected using heating degree days (base 15.5 °C in the UK). The order never changes: make it reliable, then optimise.
AI Control only comes into play when a site's energy management is genuinely complex. Otherwise, a well-tuned control sequence is enough.
A power meter is only as good as the data that comes out of it
Measuring is not enough. A power meter only produces useful data when three links in the chain hold. It needs a connection to the BMS, trend logging at a known time interval and a reconciliation check against the main meter. Without them, the device displays values and nothing more. Before plugging a monitoring tool into your power meters, such as the free Foobot EMS, have what they actually send checked.
FAQ - power meter
What is the difference between an energy meter and a power meter?
An energy meter totals kWh, often with MID/MIR approval so it can be used for recharging. A power meter calculates active power, reactive power, power factor and harmonics, then sends them to the supervisory system.
Which electrical values does a power meter measure?
It records the usual electrical values: voltages, currents, active, reactive and apparent power, power factor, energies and total harmonic distortion of current. Four-quadrant metering becomes useful as soon as a site generates electricity.
Why analyse your electrical network?
Monitoring and analysing the electrical network reveals what the bill does not tell you. Excessive reactive energy exposes a half-hourly metered site to reactive power charges. Harmonics heat up cables and neutrals. The advanced functions of a power quality analyser characterise power quality.
Which interface for your power meter?
Two interfaces coexist. The local display is used for checks at the panel and for commissioning. The communication interface, over a serial bus or IP, makes the measurement usable by the supervisory system. Without it, nobody reads the values back.
What is the difference between accuracy classes?
The IEC 61557-12 standard classifies power metering and monitoring devices (PMD), an acronym found on DIRIS datasheets[1][1]Standards and protocolsIEC, « IEC 61557-12:2018, Electrical safety in low voltage distribution systems - Part 12: Power metering and monitoring devices (PMD) »See in sources ↓. The lower the class index, the smaller the permitted error. Recharging follows a different logic from this standard: in Great Britain, a meter used for recharging must be approved under the Measuring Instruments Regulations 2016, the UK framework that took over the MID, with CE or UKCA marking accepted[2][2]RegulationGOV.UK, ‘Measuring Instruments Regulations 2016: Great Britain’, scope, CE and UKCA markingSee in sources ↓.
How do I install an electrical sub-meter in my distribution board?
In a commercial distribution board, the sub-meter clips onto a DIN rail, downstream of the circuit's protective device. Above the rating allowed for a whole-current meter, it is connected through a current transformer. Have it installed by a qualified electrician, with the circuit isolated.
Sources and references
4 sources.- [2]GOV.UK, ‘Measuring Instruments Regulations 2016: Great Britain’, scope, CE and UKCA marking24/03/2025↑
- [3]GOV.UK, ‘Approved Document L, Volume 2: Buildings other than dwellings’, 2021 edition incorporating 2023 amendments, BACS requirement above 180 kW (§6.66-6.73)2021, amended 2023↑
- [4]GOV.UK, ‘Approved Document L, Volume 2: Buildings other than dwellings’, 2026 edition (Future Buildings Standard), in force on 24 March 2027, 180 kW BACS threshold retained (§5.76-5.84)24/03/2026↑